Commissioning
Installation and Service Manual
Post Launch Checks
Before starting the engines, check the following:
There are no water leaks:
The waterline is at least up to the mainshaft centreline so the jet unit will prime (pump water properly)
when the engine is started.
Make sure the vessel is securely moored in deep water and well clear of other objects or craft.
Engine Running Checks (Vessel Moored)
The marine water bearing must operate wet.
Do not
operate the jet unit with the vessel out
of the water, or with the vessel ballasted such that the jet unit does not prime (pump water
properly) when the engine is started.
With the reverse lever set to zero speed, the engine(s) may be started and the engine supplier's
representatives can carry out engine checks.
If the engine cooling water is taken from the jet unit water offtake, confirm that water is passing out of
the engine exhaust outlets, where possible. Periodically check that the engine is running at the correct
operating temperature as this ensures that the engine is receiving sufficient water from the jet unit
water offtake. Check that the cooling water hoses are secure.
Failure to check cooling water hoses may result in flooding of the vessel.
Check for water leaks around the jet unit while the engine is running particularly under the bearing
housing (mainshaft water seal).
Check that the jet unit and driveshaft are running smoothly (no vibration).
Periodically check the bearing housing temperature. The bearing housing operating temperature should
not exceed 80º C.
Check that the reverse controls are working by monitoring the reverse duct position while moving the
reverse control lever(s).
Check that the steering controls are working by monitoring the steering nozzle position while moving the
helm (check that port helm gives port nozzle deflection, and that all nozzles are steering in the same
direction).
Check that the steering travel is limited by the tiller stops fitted to the transom, Refer to drawing:
HJ21206000 Steering Assembly.
At the transom seal.
At the intake base.
Visually check for water leaks from under the bearing housing
6-2
Summary of Contents for HJ212
Page 1: ...HJ212 Installation and Service Manual R3A3 Jet unit Manual ...
Page 20: ...Product Description Installation and Service Manual 2 6 ...
Page 56: ...Commissioning Installation and Service Manual 6 4 ...
Page 62: ...Fault Finding Installation and Service Manual 7 6 ...
Page 82: ...Maintenance Installation and Service Manual 8 20 ...
Page 137: ...Installation and Service Manual Appendix Notes 10 21 ...
Page 141: ...Installation and Service Manual Appendix Notes 10 25 ...
Page 164: ...Appendix Installation and Service Manual 10 48 ...
Page 166: ......
Page 169: ......
Page 171: ......
Page 172: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 181: ......
Page 185: ......
Page 186: ......
Page 188: ......
Page 195: ......
Page 196: ......
Page 197: ...Notes ...