MTS ROW Assembly Instructions
4
5. Using a ½” socket wrench, unbolt the bottom lag bolts on the left side as shown in
Unpacking Figure 3. “Walk” the side off of the shipping crate onto the floor. Repeat this
step for the right side piece. Remove and discard the shipping pallet and the lag bolts.
Unpacking Figure 3. Bottom shipping bolts.
NOTE:
BE CAREFUL NOT TO DAMAGE THE FINISH OF THE MACHINE OR THE
UPHOLSTERY WHEN REMOVING THE PROTECTIVE PACKAGING MATERIAL.