HG2200/HG2200AT Operator’s
Manual
Each Use
110 - Service
Check Tire Pressure and Lug Nut
Torque (Wheeled Unit)
Check tire pressure and lug nut torque before start
up and every 10 hours of operation. Tighten
lugnuts in a star pattern using a three stage
sequence. See below for correct pressure and
torque.
Check Fuel Level and Refuel
Check fuel level before start up and every 10 hours of operation. Fill fuel tank at fill (1) with approved fuel
to fill line on fill pipe (2) at the end of each day to prevent condensation.
Pressure Stage
Torque
105 psi
(7.2 bar)
First
50-60 ft•lb
(68-81 N•m)
Second 90-200 ft•lb
(122-271 N•m)
Final
275-325 ft•lb
(373-441 N•m)
Fuel and its
vapors are
extremely
flammable. Fire or
explosion can cause death or serious injury.
To help avoid injury:
•
Keep heat, sparks, flames and other ignition
sources away.
•
Refuel only with engine off.
•
Refuel only outdoors.
•
Wipe up spilled fuel immediately.
j64om029w.eps
j64om030w.eps
1
2
Summary of Contents for HG2200
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls ...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport ...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe ...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service ...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications ...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours ...
Page 146: ......