HG2200/HG2200AT Operator’s Manual
Retrieve Tracked Unit
Transport - 73
Unload Unit
1. Lower ramps.
2. Remove tiedowns.
3. Start unit. See “Start Unit” on page 64.
4. Raise stabilizers.
5. Ensure engine is at full throttle and slowly back unit down trailer or ramps.
Retrieve Tracked Unit
Under normal conditions, winch should not be towed. If unit breaks down and retrieval is necessary:
•
tow for short distances at less than 1 mph (1.6 kph),
•
use maximum towing force of 1.5 times unit weight,
•
use towing chains appropriately rated for maximum towing force,
•
attach chains to indicated tow points facing towing vehicle.
To attach chains to tow points, determine which
points are facing towing vehicle.
Loop chains around crossmember (either front or
back) on winch frame.
Crushing weight could cause death or serious injury. Use
proper procedures and equipment or stay away.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Ensure trailer wheels are blocked.
•
Attach trailer to vehicle before loading or unloading.
IMPORTANT:
When hydraulics are disengaged, unit has brakes.
Summary of Contents for HG2200
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls ...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport ...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe ...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service ...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications ...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours ...
Page 146: ......