HG2200/HG2200AT Operator’s Manual
Electric Strike System (ESID)
Systems and Equipment - 93
Electric Strike System (ESID)
Any time you burst pipe in an electric jobsite, electric strike system must be properly set up, tested, and
used. You should wear protective boots and protective gloves should be within reach, all meeting the
following standards:
•
Boots must have high tops and meet the electric hazard protection requirements of ASTM F2413 or
ASTM F1117 when tested at 18,000 volts. Tuck legs of pants completely inside boots.
•
Gloves must have 17,000 AC maximum use voltage, according to ASTM specification D120.
If working around higher voltage, use gloves and boots with appropriately higher ratings.
Read and follow “Prepare Jobsite” on page 58. Review safety procedures before each job.
If an electric strike occurs, immediately contact your local HammerHead
®
dealer to have the electric strike
system tested.
FCC Statement
The Electric Strike System has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the
FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated
in a commercial environment. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used
in accordance with the instructions, can cause harmful interference to radio communications. Operation of this equipment in a
residential area could cause harmful interference which the user will be required to correct at his own expense.
Changes or modifications not expressly approved in writing by The Charles Machine Works, Inc. may void the user's authority to
operate this equipment.
NOTICE:
The strike system does not prevent electric strikes or detect strikes before they occur.
If
alarms are activated, a strike has already occurred
and equipment is electrified.
Summary of Contents for HG2200
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls ...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport ...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe ...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service ...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications ...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours ...
Page 146: ......