HG2200/HG2200AT Operator’s Manual
Gather Information
52 - Prepare
Gather Information
A successful job begins before the pull. The first step in planning is reviewing information already available
about the job and jobsite.
Review Job Plan
Review blueprints or other plans and make sure you have taken enlargement during pullback into account.
Check for information about existing or planned structures, elevations, or proposed work that may be
taking place at the same time.
Notify One
-
Call Services
Mark proposed path with white paint and have underground utilities located before working.
•
In the US or Canada, call 811 (US) or 888-258-0808 (US and Canada). Also contact any local utilities
that do not participate in the One-Call service.
•
In countries that do not have a One-Call service, contact all local utility companies to have
underground utilities located.
Examine Pullback Material
Ask for a sample of the new product material you will be pulling back. Check its weight and stiffness.
Contact the manufacturer for bend radius information. Check that you have appropriate pullback devices.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Summary of Contents for HG2200AT
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Page 146: ......