HG2200/HG2200AT Operator’s Manual
Plan Pull Path
58 - Prepare
Plan Pull Path
Plan the pull path, from entry to end, before job begins. Locate the entire route of the pipe to be replaced to
ensure a straight path. Expose all crossing or parallel utilities in accordance with local regulations.
Prepare Jobsite
Mark Pull Path
Mark your planned pull path with white flags or paint.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
274-050; 274-724 (2P), 700-133
To help avoid injury:
•
If jobsite classification is in question or the possibility of unmarked electric utilities exists, classify
jobsite as electric.
•
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
Summary of Contents for HG2200AT
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Page 146: ......