HG2200/HG2200AT
Operator’s Manual
Connect Tooling Head
Burst Pipe - 81
Connect Tooling Head
Same Path™ Pipe Slitting
Technology
1. Shut down unit. See “Shut Down Unit” on
2. Thread wire cable (1) through blade set (2)
and expander (3).
3. Slide jaws (4) onto wire cable and allow 1/4”
(6.35 mm) of wire cable to extend past the
jaws.
4. Pull jaws into the expander.
5. Attach swivel (5) to the wire cable.
6. Tighten swivel in the expander.
7. Attach swivel to pipe puller (6).
Misuse of machine can cause death or serious injury.
Read and understand operator’s manual and all other safety instructions
before use.
To help avoid injury:
•
Maintain 2-way communication between bursting pit and all other personnel.
•
Make sure all personnel are clear of moving parts.
•
Do not attempt to use any part of body to assist wire cable entering/exiting bursting unit.
•
Keep winch doors closed during operation.
IMPORTANT:
See “Same Path™ Pipe Slitting Technology” on page 76 for more information.
j57om058w.eps
1
2
3
4
5
6
Summary of Contents for HG2200AT
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Page 146: ......