HG2200/HG2200AT Operator’s Manual
Electric Strike System (ESID)
94 - Systems and Equipment
Assemble Voltage Detector
1. Drive voltage stake into ground at least 6’ (2 m)
away from any part of system.
2. Clip voltage limiter to voltage stake.
Assemble Grid Mat
1. Remove mat from storage.
2. Place mat next to operator’s station.
3. Connect bonding cables to grid mats.
4. Remove ground rod from storage.
5. Drive ground rod into soil near grid mat.
6. Move cords and cables under grid mat.
7. Connect ground cable clamp to ground rod.
Summary of Contents for HG2200AT
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Page 146: ......