Assembly (continued)
8
Anchoring the garden house
□
Adjust the location of each post (A) until all posts (A) are standing comletely upright on level ground. Hammer two ground stakes (FF)
through the holes on each post base (N) into the ground.
11
□
Measure out from post to the longest possible distance to best use the length of the guy rope (GG) and secure anchor (HH) to ground
at 45 degress.
□
Cover all the bolts (AA, BB and CC) with bolt covers (EE).
HAMPTONBAY.COM
Please contact 1-855-HD-HAMPTON for further assistance.
HH
45
。
GG
FF
FF
A
N
EE
CC