background image

 

1

1

Installation

 (

continued

B. NEW CONSTRUCTION - SUSPENDED BETWEEN 

JOIST

A

B

B

21

A21. Test the motor. If the motor does not run, check 
the plug connection.

B11. Slide the mounting rails (A) into the brackets on 
the housing (B).

B12. Position the correct depth mark at the bottom 
edge of the joist based on the thickness of your 
sheetrock.

B13. Mark the position of the screws by using holes 
as a template.

Summary of Contents for 80213

Page 1: ...r home Visit us online to see our full line of products available for your home improvement needs Thank you for choosing Hampton Bay USE AND CARE GUIDE Questions problems missing parts Before returnin...

Page 2: ...servicing or cleaning the unit switch the power the service panel and lock the service disconnecting means to prevent power from being switched on accidentally When the service disconnecting means ca...

Page 3: ...n warranty service you must present a copy of the receipt as proof of purchase All costs of removing and reinstalling the product are your responsibility Damage to any part such as by accident or misu...

Page 4: ...ing opening are multiple installation configurations possible for this ventilation fan Not all configurations are shown If your installation requires CAUTION To avoid motor bearing damage and noisy un...

Page 5: ...Drill Slotted screwdriver Saw Ruler Pencil Wrench Duct vent Duct clamp Duct tape Duct piping MATERIALS REQUIRED NOTE Hardware not shown to actual size HARDWARE INCLUDED Part Description Quantity AA 4...

Page 6: ...urther assistance Pre installation continued Part Description A Mounting Rail B Housing C Wiring Cover D E Motor PACKAGE CONTENTS A B C D E F G H I J K Part Description G H Grill Nut I Glass Dome J Do...

Page 7: ...tes Remove F 1 Turn off the power source 2 Loosen the motor screws F from the motor E and housing B 3 Remove the motor blower E from the housing B 4 Remove packing material 6 Back out the pre loaded s...

Page 8: ...9 For New Construction suspended between joists go to step B page 11 For Existing Construction accessible from above go to step C page 15 For Existing Construction accessible only from below go to st...

Page 9: ...ST B AA A11 Position the correct depth mark at the bottom ge of the joist based on the thickness of your sheetrock ed A13 Route wires through the strain relief A12 Screw pre loaded screws into the joi...

Page 10: ...ing cover C A18 Reinstall the motor E by inserting the tabs and pushing up into position Make sure the wires are not pinched between the motor and the housing A16 Connect 4 duct and vent to the outsid...

Page 11: ...or If the motor does not run check the plug connection B11 Slide the mounting rails A into the brackets on the housing B B12 Position the correct depth mark at the bottom edge of the joist based on th...

Page 12: ...a hole in the center of each outline B17 Tighten the screws B15 Insert screws leaving space between the screw head and the joist Screws are not provided B18 Route wires through the strain relief B16...

Page 13: ...box or under the wiring cover C B22 Connect the wiring harness DO NOT ALLOW THE MOTOR TO HANG FROM THE WIRING HARNESS B21 Connect 4 duct and vent to the outside Tape joints If ducting does not fit se...

Page 14: ...4 1 Installation continued 21 B24 Secure the motor by tightening the two screws F B25 Turn on the power source B26 Test the motor If the motor does not run check the plug connection F...

Page 15: ...ng is large enough to accommodate the new motor housing 8 x8 1 2 Use the motor housing as a template to mark position Cut out an opening for the housing C12 Slide the mounting rails A onto the bracket...

Page 16: ...ails A onto the screws C15 Drill a hole in the center of each outline C18 Tighten the screws C16 Insert screws leaving space between the screw head and joist Screws are not provided C19 Connect 4 duct...

Page 17: ...relief screws C22 Connect wires as shown using the wire nuts AA C23 Install the wiring cover C using the wiring cover screw D Make sure all wiring connections are inside the box or under the wiring c...

Page 18: ...g the tabs and pushing up into position Make sure the wires are not pinched between the motor and the housing C28 Test the motor If the motor does not run check the plug connection C26 Secure the moto...

Page 19: ...he new motor housing 8 x8 1 2 D14 Attach existing ducting to duct connector Tape joints If ducting does not fit securely an adapter may need to be purchased D12 Move the housing B into position above...

Page 20: ...wiring connections are inside the box or under the wiring cover C D19 Reinstall the motor E by inserting the tabs and pushing up into position Make sure the wires are not pinched between the motor an...

Page 21: ...does not run check the plug connection E1 Remove the grill nuts H from the housing B E2 Connect the wiring harness DO NOT ALLOW THE FIXTURE TO HANG FROM THE WIRING HARNESS E3 Align posts A B C and D...

Page 22: ...ill nuts MUST be properly installed E4 Attach the grill nuts H E7 Secure the glass dome I into position against the fixture using the dome cover J and finial K E5 Install the LED bulbs L E6 Align the...

Page 23: ...80213 Air direction 80 cfm Voltage 120 V Hertz 60 Hz Duct diameter 4 in 10 16 cm Noise 2 0 Sone Power consumption watts 23 W Speed 1250 rpm Air deliver at 0 1 WG 80 cfm Weight 11 9 lbs 5 4 kg Problem...

Page 24: ...ance Service Parts Part Number If you need parts or service assistance please call 1 855 HD HAMPTON or visit us at our web site at http www HAMPTONBAY com 95044 01 000 95029 01 000 77481 01 000 03242...

Page 25: ...ton Bay Customer Service 1 855 HD HAMPTON HAMPTONBAY COM Questions problems missing parts Before returning to the store 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday Retain this manual for fu...