background image

 

 

Warranty

 

 

 

 

 

PLANNING INSTALLATION   

TOOLS REQUIRED 

 

 

 

 

Ladder

Safety 

goggles

 

   Wire

stripper

Gloves

Phillips 

screwdriver

Electrical 

tape

  Drill 

 7/32 in. or 5/8 in. Drill bits

   

HARDWARE INCLUDED

 

 

            

AA

      

 

 

 

 

         

BB

  

                      

CC  

  

 

              

DD

                             

  EE  

  

    

          

   

Pre-installation 

 

 

Part

Description

Quantity

 

 

2

 

2

 

2

DD 

CC 

BB

AA 

EE

Wire connector
Machine screw

Anchor

Phillips screw

Toggle bolts

 

2

  

 Read all instructions before assembly.

 To avoid damaging this product, assemble it on a soft, non-abrasive surface such as carpet or cardboard. Inspect each part for 

  damage that may have occurred during shipping. 

 Keep your receipt and these instructions for proof of purchase.

Hacksaw

NOTE:

 Hardware not shown to actual size.

The manufacturer warrants this lighting fixture against defects in materials and workmanship for a period of five years from the date 
of 

purchase. If within this period the product is found to be defective in material or workmanship, the product must be returned, with a 

copy of the bill of sale as proof of purchase, to the original place of purchase. The manufacturer will, at its option, repair, replace, or 

incidental, or consequential damages. As some states do not allow exclusions or limitations on an implied warranty, so the above 

rom 

state to state. 

Contact the Customer Service Team at 1-855-HD-HAMPTON or visit www.hamptonbay.com.

HAMPTONBAY.COM

Please contact 1-855-HD-HAMPTON for further assistance.

Summary of Contents for EC1577BK-D

Page 1: ... m EST Monday Friday 9 a m 6 p m EST Saturday Item 1004618676 805259 1004618677 805239 1004612996 805299 1004612982 805279 We appreciate the trust and confidence you have placed in Hampton Bay through the purchase of this lingt fixture We strive to continually create quality products designed to enhance your home Visit us online to see our full line of products available for your home improvement ...

Page 2: ...National Electrical Code If you are unfamiliar with methods of installing electrical wiring secure CAUTION Refer to the re lamping label located on the IMPORTANT For use with Hampton Bay EC series line voltage track systems only Do not install any part of this track system less than 7 ft Do not install any lamps closer than 6 in from any curtain or similar combustible material Tools Required NOTE ...

Page 3: ...ions for proof of purchase Hacksaw NOTE Hardware not shown to actual size The manufacturer warrants this lighting fixture against defects in materials and workmanship for a period of five years from the date of purchase If within this period the product is found to be defective in material or workmanship the product must be returned with a copy of the bill of sale as proof of purchase to the origi...

Page 4: ...e Twist lock connector preassembled to mounting plate B Canopy preassembled to mounting plate B Canopy screw preassembled to canopy D Track section Track head Trim preassembled to track head G Connector s locking tab preassembled to track head G Knob preassembled to track head G F G K H I J B A C D E Note Some fixture shapes may vary not shown for all models but the same assembly method ...

Page 5: ...ire and wire connectors DD back into the outlet box not included B A C D E B F 4 ft or less in length has one mounting opening spaced a maximum of 6 in from each track end section A single section of track that is greater than 4 ft in length must have mounting openings a maximum of 12 in from each end of the track with additional openings a minimum of every 4 ft along the length of the track secti...

Page 6: ... track section F and thread 1 2 in toggle onto bolts Place the track section F against the ceiling and insert the toggle bolts AA into the holes until the springs open Tighten the bolts AA 5a NOTE Toggle bolts AA should be used for standard installation into drywall drop ceiling or suspended ceiling applications Anchors CC are used for masonry installations ONLY Toggle bolt installation Align the ...

Page 7: ...section F has an indented groove on the face and two internal copper strips The track head G can only be assembled if the ground sides of the track head G connector and the track section F are aligned Identify the ground side on the track head G connector and track section F Push the top portion of the track head G connector into the slot of the track section F Pull down the connector s locking ta...

Page 8: ...terior and exterior surfaces of the Troubleshooting The fuse blows or circuit breaker trips when the light bulb is illuminated The light bulb is burned out The power is off Replace the light bulb Check the wiring you are not comfortable troubleshooting wiring problems Test or replace the switch track head G to cool down Pull down on the track head connector s locking tab J and twist until the trac...

Page 9: ... this manual for future use 1 855 HD HAMPTON HAMPTONBAY COM Questions problems missing parts Before returning to store call Hampton Bay Customer Service 7 a m 6 p m EST Monday Friday 9 a m 6 p m EST Saturday ...

Page 10: ...roductos disponibles para las necesidades de mejoras de tu hogar Gracias por elegir Hampton Bay 1 855 HD HAMPTON Preguntas problemas o piezas faltantes Antes de regresar a la tienda llama al servicio al cliente de Hampton Bay de lunes a viernes de 7 a m a 6 p m hora estándar del Este y sábados de 9 a m a 6 p m hora estándar del Este HAMPTONBAY COM EC8715BK D EC8715WH D EC1577BK D EC1577WH D Modelo...

Page 11: ...se deben hacer conforme con el en un lugar húmedo durante el cambio de las bombillas desmonta la lámpara del riel antes de cambiar la bombilla las cortinas y otros materiales combustibles Consulta la etiqueta para cambio de PRECAUCIÓN Código Nacional de Electricidad y con los códigos de electricidad locales Si no estás familiarizado con los métodos de instalación del cableado eléctrico contrata lo...

Page 12: ...efectos en materiales y mano de obra por un periodo de cinco años a partir de la fecha de su compra Si durante este lapso el producto resulta defectuoso en cuanto a material omano de obra deberá devolverlo al lugar de la compra original junto con una copia de la factura de venta comocomprobante de la compra El fabricante según su criterio reparará sustituirá o reembolsará el precio de la compra al...

Page 13: ...ca de montaje B Cubierta preensamblado de placa de montaje B Tornillos de la Cubierta preensamblado de la cubierta D Sección del carril Cabezal del carril Reborde preensamblado en el cabezal del carril G Lengüeta de seguridad del conector preensamblado en el cabezal del carril G Perilla preensamblado en el cabezal del carril G Remarque A forme des luminaires peut varier les modèles ne sont pas tou...

Page 14: ... largo debe tener una abertura de 12 plg 300 mm para el montaje como máximo desde cada extremo del riel con aberturas adicionales cada 4 pies 1 22 m a lo largo de todo el riel Las aberturas adicionales cada 4 pies 1 22 m a lo largo de la sección del riel se deben agregar según sea necesario Retire los tornillos de la cubierta E del cubierta D para exponer la placa de montaje B B A C D E Desliza la...

Page 15: ...iones en mampostería Instalar el perno acodado la caja de salida B F A 5b Instalación de los anclajes 6 BB F CC Inserte los tornillos Phillips BB a través de la sección del carril F y apriete las anclas de expansión CC Fijar la placa de montaje al riel Apriete los tornillos de montaje A del carril para asegurar la sección del carril lineal F a la placa de montaje B montaje EE B Coloque la sección ...

Page 16: ...engüetas de metal El lado de puesta a tierra de la sección del carril F tiene una ranura dentada en la parte frontal y dos tiras de cobre internas El cabezal del carril G sólo se puede ensamblar si los lados con puesta a tierra del cabezal del carril G y la sección del carril F están alineados J del carril G y la sección del carril F Presione la parte superior del conector del cabezal del carril G...

Page 17: ...bombilla Revisa el cableado solución de problemas del cableado Prueba o reemplaza el interruptor Jale hacia abajo la lengüeta de bloqueo del conector J del cabezal del carril y gire hasta que el cabezal del carril G se libere Para retirar el cabezal del carril G de la sección del carril F primero permita que se enfríe el cabezal del carril G Para limpiar la lámpara desconecta primero la electricid...

Page 18: ...s de regresar a la tienda llama al servicio al cliente de Hampton Bay de lunes a viernes de Conserva este manual para uso en el futuro 7 a m a 6 p m hora estándar del Este y sábados de 9 a m a 6 p m hora estándar del Este HAMPTONBAY COM VAHD1577 004 v 1 2019 10 ...

Reviews: