Remove the 4 locknuts
from the tie rods at po-
sition A.
Loosen the 4 locknuts
at position B and back
off the nut to the end of
the stud
A
A
A
A
Screw the four 80mm
spacers on to the
ends of the tie rods
and partly screw in
the four M10x15 bolts
into the ends of the
spacers.
Wrap the insulation
jacket around the
boiler sections. Check
that the cut outs (A)
are positioned around
the rear spacers and
secure in position with
duct tape.
A
Fit the rear insulation
jacket over the flue
outlet. Secure the top
and side edges of the
rear jacket to the wrap
using duct tape
7. CASING
ASSEMBLY
The boiler casing kit consists of:
•
Side panel RH
•
Side panel LH
•
Top cover
•
Front cover with insulation
•
Rear plate RH
•
Rear plate LH
•
Boiler sections insulation jacket
•
Rear insulation jacket
•
Bag containing:-
4 bolts M10x15
15 screws 4x10
4 spacers 80mm long
1.5m of duct tape
Fig. 3. Bolier Casing Assembly