HAMWORTHY HEATING LTD
SHERBORNE
500001103/E
Initiate Start Procedure
Is the fan running?
Is mains power on?
Is there a demand from
the temperature control?
Is the condensate trap
blocked* (Red LED on
main PCB illuminated)?
Is the remote on/off control
link (R1-R2) closed?
Is there power to the fan?
Replace fan
Continued
Ref. Fig 12.2
* Condensing models only
Is there a control signal
to the fan? (24V dc across
pins 1 & 5 of 5way fan
control connector)
Has the ignition controller
reset? (Fascia lockout
indicator illuminated)
Is there a demand from the
Milton sequence control?
(If installed)
Is rotary switch ‘SW1’
on boiler main PCB set
correctly?
Is the on/off switch on?
(Fascia power on indicator
illuminated)
Is the temperature limiter
reset? (Fascia overheat
indicator illuminated)
Check fuses and
supply connections
Check and turn temperature
control knob to maximum
Check and clear
blockage
Check and close
remote circuit
Check fan power supply
wiring connections
Check fan control wiring
connections, replace
boiler main PCB
Check and reset ignition
controller (red lockout
reset button on fascia)
Check and generate
demand from Milton
(Refer also to Milton
installation manual)
Check and adjust
rotary switch
Check on/off switch position
and wiring connections
Reset temperature
limiter (Limit Stat)
No
No
No
No
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Figure 12.1. Fault Finding Procedures.
30
Summary of Contents for Sherborne Series
Page 8: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E Figure 1 1 Boiler Installation Typical 2...
Page 29: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E Figure 10 6 Gas Pipe Fitting 23...
Page 45: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E NOTES 39...
Page 46: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E NOTES 40...
Page 47: ...Notes...