HAMWORTHY HEATING LTD
SHERBORNE
500001103/E
CONTENTS
PAGE
1.0 INTRODUCTION
...............................................................................................................................
1
2.0 TECHNICAL DATA
...........................................................................................................................
4
3.0 GENERAL REQUIREMENTS
...........................................................................................................
5
3.1 Related Documents
3.2 Feed Water Quality
3.3 Adequate Water Flow
3.4 Time Clock Control
3.5 Minimum System Water Pressure
4.0 LOCATION
........................................................................................................................................
6
5.0 GAS SUPPLY
....................................................................................................................................
6
5.1 Service Pipes
5.2 Meters
5.3 Gas Supply Pipes
5.4 Boosted Supplies
5.5 Boiler House Control Valve
5.6 Boiler Gas System Leak Check
6.0 FLUE SYSTEM
..................................................................................................................................
7
6.1 General Requirements
6.2 Condense Drain
6.3 Design Waste Gas Volume and Temperature
6.4 Maximum Length of Flue Duct
6.5 Disconnection
6.6 Flue Discharge
6.7 Surface Temperatures
6.8 Flue System Location
7.0 AIR SUPPLY
...................................................................................................................................
12
7.1 Air Supply By Natural Ventilation (Open Flue)
7.2 Air Supply By Natural Ventilation (Room Sealed)
7.3 Air Supply By Mechanical Ventilation (Open Flue)
8.0 WATER CIRCULATION SYSTEM
..................................................................................................
12
8.1 General
8.2 Pressure Relief Valve (Safety Valve)
8.3 Open Vent and Cold Feed Pipe
8.4 Altitude Gauge (Water Pressure Gauge)
8.5 Thermometer
8.6 Drain Valves
8.7 Circulating Pump
8.8 Minimum Water Flow Rates
8.9 Waterside Pressure Drop
8.10 Control Schemes
8.11 Unvented Systems
8.12 Modular Boiler Control Schemes
ii
Summary of Contents for Sherborne Series
Page 8: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E Figure 1 1 Boiler Installation Typical 2...
Page 29: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E Figure 10 6 Gas Pipe Fitting 23...
Page 45: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E NOTES 39...
Page 46: ...HAMWORTHY HEATING LTD SHERBORNE 500001103 E NOTES 40...
Page 47: ...Notes...