4.4 Water Supply
•
Feed and Expansion tanks to comply with static height requirements of HSE
document INDG436.
•
Cold feed and open vent pipes to comply with requirements of BS 6644.
•
Pressurised system to comply with BS 7074.
•
It is recommended that the system pipework is flushed twice before fitting the boiler
and using a water treatment.
•
It is recommended that the heating system water is treated
•
In hard water areas (>180mg CaCO
3
/litre) precautions such as water treatment are
strongly recommended to prevent the build up of sludge and scale and also to
control the system water pH to between 7.0 & 8.0.
•
Leaks in the system pipework should be fixed to prevent dilution of water treatment.
To monitor the volume of make
-
up water entering the system, a water meter must be
fitted and readings recorded in a log book to be retained on site. Do not top up with
more than 5% of the installation's water content in any one year.
•
Maximum working water pressure is 10bar (1000 kPa).
•
For minimum water pressure see Appendix ‘E’
-