HQ Little Foot Frame Assembly Instructions
| 13
December, 2019
NOTE
: If the tracks are tight up against the table top, you might need to use the 4 mm hex tool to
first loosen the three (3) installed M6 x 10 mm socket cap screws on the track supports: one at the
left, one in the center, and one at the right.
15. Level the frame: Using a spirit level and the machine, check and adjust the frame top to be level in the
place where it will be used, both front to back and side to side, by adjusting the leveling feet. If no
spirit level is available, check the table with the machine on the carriage and the tracks. When the
table is level, the machine should stay where you put it and not roll forward, backward, or side to
side.
16. Double check the frame height: Adjust the frame height so that when standing at the front of the
machine with your hands on the front handle bars, your elbows are bent at a 90-degree angle. Refer
back to step six under Table and Leg Assembly. Remove the machine and carriage from the frame.
Then have a helper lift the frame weight off the height adjusting screws so you can make a height
adjustment to both sides of the frame.