www.HandiQuilter.com/ProStitcher
07/23/12
Installation Instructions 3.11
6. The small black cable with the black 3-connector
clip should be routed underneath the P-Pod
(
Figure 3.20
)
and snapped into the quilting
machine’s “Y” encoder
(
Figure 3.21
)
.
The two black cables that run from the carriage
up to the computer should be clipped into the
cable clip under the rear handlebar as shown
in
Figure 16
to help prevent these cables from
getting caught on the edges of the carriage.
7. Verify that the Y-axis gear engages the blue rack
for the Y-axis.
a. To do this, look from the back of the machine,
between the bottom of the quilting machine
and the top of the carriage. If the white gear is
not high enough to engage the blue rack above
it
(Page 3.3, H)
, adjust the lever on the side of
the
carriage closest to the back of the carriage
(the
Y-axis disengagement lever)
into the lowest
position
(the teeth of the gear and the teeth of
the rack should engage)
.
b. If horizontal adjustment is needed to ensure
that at least half the white gear and blue rack are
interlocking, loosen the two screws that mount
the Y-axis bracket to the base plates and push
the bracket in the direction necessary while
re-tightening the screws.
8. With the power cable unplugged and both
engagement levers in the down position, ensure
that as the quilting machine is moved in both the
X and the Y directions, the corresponding gears
are rotating as well.
Figure 3.21
Figure 3.20