MS125 Internal RTC Reed Switch Connections
1234
O
R
A
N
G
E
R
ED
IN
FR
A
R
ED
8
W
A
Y
9
W
A
Y
O
N
O
N
POSITION B
POSITION A
JUMPER POSITION
CONNECTION WITH ONE SWITCH:
CONNECT ORANGE (1) TO ONE SPADE CONNECTOR
CONNECT RED (4) TO SECOND SPADE CONNECTOR
SET JUMPER ON PCB TO POSITION A
SAME CONNECTION REGARDLESS OF LIFT HAND
CONNECTION WITH TWO SWITCHES:
LEFT HAND
ORG (1 & 2) = UPPER REED, RED (3 & 4)= LOWER REED
RIGHT HAND
ORG (1 & 2) = LOWER REED, RED (3 & 4)= UPPER REED
SET JUMPER ON PCB TO POSITION B
O/C ON CIRCUIT = HALF SPEED
S/C ON CIRCUIT = FULL SPEED
(INTERNAL CURVE CONNS)
WHEN LOOM 181001. 50062 IS
PLUGGED INTO THE 4 WAY
CONNECTOR, 2 2 RED
WIRES WILL BE AVAILABLE TO
CONNECT INTO.
TRACK SECTION UPSTAIRS
RED
CHARGE CONTACT
NOTE: ON A 1000 LIFT, POWER SUPPLY CAN BE WIRED FROM BOTTOM TRACK SECTION IF REQUIRED.
SIMPLY FIT END CAP PRESSING (WITH EARTH CABLE) ON TRACK SECTION DOWNSTAIRS.
ON A 2000 LIFT, POWER SUPPLY CAN BE WIRED FROM TOP, BOTTOM OR MIDDLE OF TRACK
SECTION IF REQUIRED.
CHARGE CONTACT
POSITIVE
POSITIVE
RED
RED
BLACK
33VDC (WHITE)
0V (SHIELD)
FROM
POWER SUPPLY
TRACK SECTION DOWNSTAIRS
54
HANDICARE 2000 SIMPLICITY / STYLE INSTALLATION MANUAL
Appendix 3
HAN125 Internal RTC reed switch connections
Standard track wiring –
LH
and
RH