11
Move to the opposite side. Using the long edge of the panel as a lever, move the
panel side-to-side until the top corner is flush to the floor frame
(Fig. B)
.
Maintain the 3/4" measurement along the left edge.
Secure panel using (2) 2" nails in the corners.
Continue securing the panel using 2" nails 6" apart on edges and 12" apart inside panel.
2
BEGIN
1
PARTS REQUIRED:
x53
2" (5,1 cm)
FLOOR PANELS
Attach the
48" x 92-1/2"
panel with the 48" edge and corner flush to the floor frame
(Fig A)
.
Secure panel using (2) 2" nails in the corners.
Fig. B
(2)
Nails
(2)
Nails
3/4"
3/4"
Ensure your floor frame is square by installing one panel and squaring the frame.
Install panels with rough side up (painted grid lines).
Grid lines up
Flush
Fig. A
Flush
Flush
Flush
3/4" GAUGE
BLOCK
3/4"
GAUGE
BLOCK
x1
48 x 92-1/2" (122 x 235 cm)
48" x 92-1/2"
(122 x 235 cm)
6"
(15,2 cm)
12"
(30,5 cm)
92-1/2"
(235 cm)