29
3
Secure side wall OSB bottom plate to floor joist
using (4) 3" nails.
Secure the back wall trim to floor using (1) 3" screw.
Angle screw to hit floor frame
(Fig. D)
.
Secure the back wall trim to side wall top plate
using (1) 3" screw
(Fig. E)
.
1
2
BEGIN
2" (5 cm)
3" (7,6 cm)
3" (7,6 cm)
SIDE WALL INSTALLATION
Secure side wall panel edge to back wall
trim using 2" nails 6" apart.
Secure bottom of panel to floor
using 2" nails 6" apart.
Angle nails to hit floor frame
(Fig. C)
.
Center left side wall on floor front to back.
Secure lower and upper corner of side
wall panels to back wall trim
using (1) 2" nail
(Fig. A, Fig. B)
.
6"
(15 cm)
6"
(15 cm)
x8
x4
x62
Trim
Panel
Fig. B
2" (5 cm)
Nail
CENTER
3" (7,6 cm)
Screw
Top Plate
Fig. E
3" (7,6 cm)
Screw
Trim
Fig. D
3" (7,6 cm)
Nails
Flush
Angle nail
into floor frame
2" (5 cm)
Nail
Fig. C
Trim
Fig. A
Panel
2" (5 cm)
Nail
Remove temporary support.
You have finished standing your side walls.
Repeat STEPS 1 - 3 to install right side wall.
FINISH
4