41
DOOR
PARTS REQUIRED:
8
6
CENTER
CENTER
CENTER
CENTER
FINISH
Center trim
ZJ
over doors and secure using (8) 2" finish nails into framing, as shown.
19/32" x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm)
x4
AH
Center
Install (6)
3/4" Screws
from inside.
2" Nails x8
Nail into
framing.
Two Screws
Fig. B
ZJ
2" (5 cm)
x8
3/4" (1,9 cm)
x58
14"
(35,5 cm)
Approximately
AH
9"
(22,9 cm)
9"
(22,9 cm)
ZJ
x1
19/32" x 2-1/2" x 72" (1,5 x 6,3 x 182,9 cm)
Door
Trim
Hinge
Board
Door
Panel
Fig. A
Install (4) door rails
AH
as shown.
Secure using (4) 3/4" screws from behind.
Reinforce door trim from inside using 3/4" screws as shown
(Fig. A, Fig. B)
.
Your doors are now installed.
7
AH