18
3
Flight Preparation
Note
The following chapter is going to introduce complete flow in details before the aircraft unlocked and takes off.
Please select operation according to the actual situation after the first flight is over if it is not the used for the
first time.
Caution
Please operate by strictly conforming to the steps described in this chapter; the operation sequence can't be
reversed.
3.1
preparation and inspection
3.1.1
T1000 remote control settings
There are 6 steps (as shown in Figure 3-1 to Figure 3-11):
Figure 3-1
Figure 3-2
Summary of Contents for 3WD4-QF-10B
Page 20: ...19 Figure 3 3 Figure 3 4 Figure 3 5 ...
Page 21: ...20 Figure 3 6 Figure 3 7 Figure 3 8 ...
Page 22: ...21 Figure 3 9 Figure 3 10 Figure 3 11 ...
Page 32: ...31 Figure 3 25 ...
Page 39: ...38 Figure 4 11 Figure 4 12 ...