background image

 

 

IMPORTANT

 

If

 

you

 

have

 

any

 

problems

 

with

 

this

 

product,

 

please

 

DO

 

NOT

 

RETURN

 

THIS

 

ITEM

   

To

 

the

 

Retailer/Store

 

from

 

where

 

you

 

purchased

 

the

 

product.

 

 

Please

 

email

 

us

 

anytime

 

with

 

the

 

nature

 

of

 

the

 

problem

 

at:

 

ContactUs@Hanover

Products.com

 

Please

 

include:

   

Pictures

 

of

 

the

 

issue(s)

 

and

 

receipt

 

(if

 

available)

 

Name

 

and

 

address

 

of

 

the

 

Purchaser

 

Name

 

of

 

retailer

 

 

Or

 

call

 

our

 

Customer

 

Service

 

team

 

between

 

9:00

 

AM

 

and

 

5:00

 

PM

 

Eastern

 

Time,

 

Monday

 

through

 

Friday

 

at:

   

1

877

397

5144

 

or

 

visit

 

our

 

website

 

at:

 

www.Hanover

Products.com

 

 

 
 

To

 

expedite

 

any

 

future

 

warranty

 

claims,

 

please

 

retain

 

your

 

receipt

 

for

 

future

 

use.

 

 

For

 

additional

 

on

line

 

support

 

on

 

assembly,

 

troubleshooting

 

and

 

care

 

&

 

maintenance

 

of

 

your

 

outdoor

 

product,

 

please

 

visit

 

our

 

website

 

at:

   

www.Hanover

Products.com

.

 

 

8/1/2019

 

Summary of Contents for 9820102-1

Page 1: ...uction Metal Base of Greenhouse the assembly of the whole product quantity as mentioned in the list Do not tighten the steps until completing on IMPORTANT Please ensure that you find all parts in the...

Page 2: ...ipt if available Name and address of the Purchaser Name of retailer Or call our Customer Service team between 9 00 AM and 5 00 PM Eastern Time Monday through Friday at 1 877 397 5144 or visit our webs...

Page 3: ...ded aluminum The greenhouse must be positioned and fixed on a flat level surface Do not lean against or push the greenhouse during construction Keep children away from the assemble area Do not positio...

Page 4: ...2 Angle Square 3 Level Meter Silicon 8 Percussion bit 10mm 25 64 7 Marking Pen 6 Wooden Mallet 5mm 13 64 inch hexagon wrench 5 Electric screwdriver 4 Hexagon wrench 5mm 13 64 inch 1 Triangle Stair 5...

Page 5: ...5 PART LIST...

Page 6: ...6 Do not fully tighten screws...

Page 7: ...7 F1 Door Assembly Note Lay the door frame on a flat surface Make sure that door is square and even before tightening screws...

Page 8: ...8 Note Make sure that the window is flat and even before rightening all screws Window Installation Window supporting knob...

Page 9: ...9 Pre place F4 screws in below parts and quantity Screw Preparation...

Page 10: ...lace 1 piece F4 screws in parts 10R 10L part 4 5 and 6 with pre placed F4 screws in Frame Installation Fix the frame at each corner should be placed 3 pieces screws There are 2 pieces groove in part 7...

Page 11: ...S2 2 Attach rails 12 15 12 3 Attach panels P4R P6 P4L to rails 12 15 12 Pre place 2 pieces F4 screws into each part 12 and 15 Fix the beam of back wall 14 with the pre placed F4 screws at previous ste...

Page 12: ...to 9 and 1 you need to pre place 3 pieces F4 screws pieces groove in part 7 and placed 4 pieces screws There are 2 Front Wall Installation piece F4 screw in the other groove screws pre placed in previ...

Page 13: ...13 7 and parts 9 with Front Wall Installation Pre place 2 pieces F4 screw in each part 12 Fix parts 12 onto part pre placed screws PC panels installation...

Page 14: ...ms Installation Fix part 8 on to part 7 with the preplaced F4 screws Pre place 2 pcs F4 screws in each part 9 Fix parts 16 onto part 8 with F4 screws according to the figure 2 pieces screws for each 1...

Page 15: ...n parts 16 Install roof crown 17 Combine parts 9 13 and 16 Roof beam Installation and Screwing Pre place 2 pieces F4 screws into each part 16 13 16 16 16 16 16 16 16 16 9 9 with parts B4 using F4 bolt...

Page 16: ...16 Corner Fixation Plates Installation Corner caps B5 B6 Installation with the pre placed screws Upper door rail installation...

Page 17: ...ndow and insert 2 No 20 Installation Middle Wall Frame No 19 Installation Roof Middle Frame Fix 2 pcs F4 screws in each 19 part Please insert 4 screws in the two 20 profiles beside screws in other 20...

Page 18: ...ion Fastenings and Reinforcing Ribs Installation 1 Assemble the window base B7 15 using bracket B1 with the pre placed F4 scerws in part 20 1 Assemble the six cross braces 22 and four cross braces 23...

Page 19: ...llation 1 Insert the wall panels P8 into the grooves of 7 and 19 2 Button the part S2 onto the bottom of each P8 panel then push the P8 panels to the bottom against the part 4 1 Insert all roof panels...

Page 20: ...ert two gutters 25 Drain Profiles Water Outlet and End Caps Assembly Finishing Triming Using a water level or square to make sure that your greenhouse is straight and level Tighten hex bolts at this t...

Page 21: ...is the case please fix immediately to avoid damage 2 Please prevent adding any increased weight to the product compromise the structure and durability of the product If the structure is compromised it...

Page 22: ...et functions essentially as new including tears rips chips scratches or stretching of materials and stitching 3 Tears rips punctures scratches or any damage caused by improper installation or use 4 Fa...

Reviews: