but don't fully tighten them.
Place 10 pieces F4 screws into the pre-drilled holtes on
into the long frame profiles 6#
the F4 screws.
1# profiles
Step III:
Step II:
into the frame profiles 3#
Installation for the frame of greenhouse
Inserting the tail of F4 screws
of mini greenhouse.
Step I:
Inserting the tail of F4 screws
of mini greenhouse.
Don't fully tighten
-12-