background image

14

15

A

B

C

D

Deutsch

Deutsch

Verpackungsinhalt

Duschwanne/Schürze/Montagezubehör

Dach

Rückwand

Tür/Türrahmen

English

English

Packaging Contents

Shower tray/roof/skirt/installation accessories

Roof

Door/Door Frame

Rear panel

Italiano

Italiano

Contenuto della confezione

Piatto doccia / pannello del piato doccia / accessori di montaggio

Cappello

Chiusura fissa e scorrevole

Parette

Summary of Contents for PHARO 21116000

Page 1: ...Aquafun M o n t a g e a n l e i t u n g Aquafun 140 DL 10 Comfort 21116000 Aquafun 140 DL 10 Deluxe 21124000 Deutsch Installation Instructions English Istruzioni di montaggio Italiano ...

Page 2: ...usenfunktionen 50 Elektronisches Bedienelement 54 Störungen und Abhilfen 70 English Contents Preface Connection Dimensions 4 Preface Connection Dimensions 5 Equipment 6 Spare Parts 8 Safety Instructions 10 Used Symbols 11 Technical Information 13 Check list 14 Packaging Contents 15 Required Tools 16 Shower Tray Feet Setting Shower Tray Alignment 18 Removing the Side Casing 20 Installing the Rear P...

Page 3: ...ello laterale 20 Montaggio della parete 22 Preparativi per la chiusura 24 Montaggio regolazione della porta scorrevole 30 Montaggio della copertura superiore 32 Messa a terra alimentazione elettrica 34 Collegamento dell illuminazione altoparlante 36 Montaggio dei tubi flessibili di raccordo soffione doccia 38 Montaggio della doccia a vapore copertura del tetto pannello laterale 42 Regolazione dell...

Page 4: ...EEC 93 68 EEC guidelines specified by the European Guideline for electro magnetic compatibility is assured by the application of the following European standards EN 55014 EN 55104 EN 61000 3 2 and EN 61000 3 3 Connection dimensions Fig B Position 1 Recommended position for elec trical supply cable exit from the wall cable 3 x 1 5 mm2 cable length 2600 mm Position 2 Recommended position for cold wa...

Page 5: ... 4 Ideal für Wasserablauf Ansichten vermaßt English Inside view Ground plan Connection dimensions Marked area 4 ideal for water drainage Preface Connection Dimensions Italiano Vista interna Pianta Quote di collegamento Zona a tratteggio 4 raccomandata per lo scarico Quote di collegamento ...

Page 6: ...aging jet 12 Pharo back showers massaging jet 8 neck jets Mistral 3 hand shower 3 jet types Raindance head shower 5 jet types Unica D shower bar height adjustable by 600 mm Shower combination Steam control function via an electronic oper ating element Steam on off The steam generator s out put amounts to 2 4 kW Adjustable steam time Output regulation Fragrance admission via an aroma filter Cascade...

Page 7: ...7 1 2 3 4 5 6 7 8 9 10 10 Deutsch Ausstattung English Equipment Italiano Equipaggiamento ...

Page 8: ...er cover for speaker cover shut off unit with selector handle escutcheon Ø 68 mm nut thermostat cartridge handle for thermostat sleeve control panel wall bar support U D handshower shower hose neck jet body shower 1 way 12V solenoid valve 3 4 male bayonet fitting boiler water level sensor potentiometer for water level sensor solenoid valve water supply boiler solenoid drain valve heating spiral 23...

Page 9: ...9 1 2 3 5 4 6 7 8 10 9 11 14 30 16 20 15 17 18 13 12 22 23 24 25 26 21 27 28 19 29 31 32 33 34 Deutsch Serviceteile English Spare Parts Italiano Parti Di Ricambio ...

Page 10: ...ny installed safety provisions or safety equipment may not be modified or removed Note The steam shower s construction must not be changed Only original components may be used Power supply The electrical connection should only be car ried out by an electrician i e your electrical installer The entire power supply is realized via a 230 V 50 Hz AC connection and must be fused via a 2 pole RCCB with ...

Page 11: ...ot evaded the con sequences are death or serious injuries Warning Describes a possibly dangerous situation If this situation is not evaded the consequences are death or serious injuries Caution Describes a possibly dangerous situation If this situation is not evaded the consequences are slight or insignificant injuries as well as property damage Attention two persons required Attention Describes a...

Page 12: ...ul situations however no dangerous or harmful situations Installer required Installer Describes installation works that may only be carried out by an installer Electrician required Electrician Describes installation works that may only be carried out by an electrician Italiano Simboli utilizzati Avvertenza cartello di avvertenza ad esempio i Indica suggerimenti ed altre azioni partico larmente uti...

Page 13: ... and neck shower 21 4 l min Steam generator 2 0l 30min Operable as of 2 bar A maximum of two loads may be interconnected The connec tions for water intake and water drainage must be installed in accordance with the currently valid DIN 1988 EN1717 standard and the local regulations Note Flow type water heater The steam shower cannot be applied in con nection with hydraulically electronically or the...

Page 14: ...dles Screw set Installation set angle brackets B Roof Top cover roof Cover C Rear panel Rear panel Compensation profile Wall compensation profile Side casing D Door Door Frame Slide door Support frame Italiano Elenco di controllo A Piatto doccia cappello con troccappelo accessori di montaggio Vasca della doccia Fascia di copertura del piatto doccia Tubo flessibile della doccia Doccia manuale Manig...

Page 15: ...h Rückwand Tür Türrahmen English Packaging Contents Shower tray roof skirt installation accessories Roof Door Door Frame Rear panel Italiano Contenuto della confezione Piatto doccia pannello del piato doccia accessori di montaggio Cappello Chiusura fissa e scorrevole Parette ...

Page 16: ...p pliers Wrench set SW 8 10 15 22 24 Socket wrench SW 2 4 Multi tooth screwdriver 4 mm Crosstip screwdriver 6 8 mm Flat screwdriver 6 8 10 mm Hammer small fitter s hammer Fittings grease Silicone free of acetic acid Drill 2 6 mm Knife Drilling machine Electric screwdriver 4 installation blocks Step ladder Required Tools Italiano Per il montaggio sono necessari i seguenti attrezzi ed accessori Live...

Page 17: ...17 Armaturenfett Silikon Deutsch Benötigte Werkzeuge English Required Tools Fittings grease Silicone Italiano Attrezzi necessari Grasso per rubinetteria Silicone ...

Page 18: ...nut must be secured using an SW 15 wrench Fine adjustment Fig C Position the shower tray 1 with the help of a spirit level 4 Carry out the fine adjust ment by screwing the tray feet 3 in or out Secure the tray feet s counter nut using an SW 15 wrench Note The position of the shower tray s front edge Fig C must be measured with the spirit level 4 and finely adjusted at the tray feet 3 The shower tr...

Page 19: ... 1 4 3 A B C 5 SW 15 Deutsch Einstellung Wannenfüße Ausrichtung Duschwanne English Shower Tray Feet Setting Shower Tray Alignment Italiano Regolazione dei piedi del piatto doccia posizionamento del piatto doccia ...

Page 20: ...panel Loosen the screws 3 with the screwdriver 5 and remove them together with the wash ers 4 Fig B Remove the side casing and the wall com pensation profile Note The wall compensation profile 1 is equipped with a terminal block and can therefore be moved towards the wall Fig A Italiano Smontaggio del pannello laterale Togliere il pannello laterale 2 e il profilo di compensazione a parete 1 dal pa...

Page 21: ...21 5 4 1 2 3 A B Deutsch Seitenverkleidung abnehmen English Removing the Side Casing Italiano Smontaggio del pannello laterale ...

Page 22: ...th of the con tact surface and the rear panel Fig A Attention The rear panel must be very carefully placed on the shower tray Fig B by two persons in a way which ensures that the 4 threaded bolts of the shower tray correspond with the 4 drill holes of the rear panel s fram ing Insert the 4 6 4 x 18 washers 2 and screw the 4 M6 nuts 1 to the shower tray using the four screws Fig C Note To avoid any...

Page 23: ...23 2 1 A B C Deutsch Montage Rückwand English Installing the Rear Panel Italiano Montaggio del pannello posteriore ...

Page 24: ...c screwdriver Fig B Remove the compensation profiles Fig A Attention Two persons are required to remove the glass elements from the packaging The 8 nut inserts 1 must be adjusted in the support frame s groove in accordance with the respective profiles hole clearances Fig C D Preparing the Door frame Installation Italiano Con un cacciavite o un avvitatore svitare le 4 viti di fissaggio fig B Toglie...

Page 25: ...25 D C 1 1 A B Deutsch Vorbereitung Montage Türrahmen English Preparing the Door Frame Installation Italiano Preparativi per la chiusura ...

Page 26: ...d left of the support frame and secure them using the M4 x12 screws 3 Note The slide door can be installed on the left or right side Carefully deposit the support frame on mounting blocks after the compensation profiles installation to avoid any damage Fig C Apply a silicone bead to the lower side of the support frame on the whole length Fig D 4 Apply a silicone bead between plastic cover and supp...

Page 27: ...27 2 1 A B D C 2 3 3 4 5 Deutsch Vorbereitung Montage Türrahmen English Preparing the Door Frame Installation Italiano Preparativi per la chiusura ...

Page 28: ...u ring the installation 2 attach it to the rear panel with an offset of approx 15 mm and then lower it Fig B Note The support frame must be attached without smearing the silicone bead For screwing use plastic sealing washers 3 ans sealing covers 4 Tightly screw the support frame 2 to the compensation profiles together with the rear panel Fig C 8 V2A 16 x 4 2 screws Italiano Preparativi per la chiu...

Page 29: ...29 1 A B 3 2 4 C Deutsch Vorbereitung Montage Türrahmen English Preparing the Door Frame Installation Italiano Preparativi per la chiusura ...

Page 30: ... to loosen the 4 threaded pins within the eccentric ele ments 5 Wrench the eccentric elements 5 with the screwdriver until the lower rollers are inserted into the support frame s profile Lock the 2 upper eccentric elements with the socket wrench 6 Note Apply some floating medium to the guide bar Fig B Installing the door handles Mount the door handles 8 by placing the 4 o rings into the groove ins...

Page 31: ...31 2 3 6 5 5 6 1 A B 9 7 8 4 Deutsch Schiebetür einbauen einstellen English Installing Adjusting the Slide Door Italiano Montaggio regolazione della porta scorrevole ...

Page 32: ...ill to drill holes through the rear panel 7 and the top cover 1 from beneath at the 10 specified points 4 Use self drilling screws 6 to screw the top cover 1 to the rear panel 7 Insert the transparent rubber sealing at the door frame s bottom side and top side Re move any overhang with a knife Fig A The cabin must be sealed with silicone at the support framing s right and left bottom cross bar fro...

Page 33: ...33 7 5 1 A C D 8 6 2 3 1 B 4 1 E Deutsch Montage obere Abdeckung Dach English Installing the Top Cover Italiano Montaggio della copertura superiore ...

Page 34: ...n Fig A Connect the earthing cable to terminal 1 to the rear panel s frame 5 For this pur pose place the cable end piece beneath the clamping washer 4 Attach the lock washer 3 and the hexagon nut 2 and secure the M5 hexagon nut 2 with an 8 mm wrench Power supply connection Fig B Remove the control s cover 6 and connect the phase 7 the zero conductor 8 and the earthing connection 9 Fig B Close the ...

Page 35: ...35 SW 8 1 2 3 4 5 7 9 6 8 A B Deutsch Erdungsmaßnahme Stromversorgung English Earthing Measure Power Supply Italiano Messa a terra alimentazione elettrica ...

Page 36: ...umination 1 only Deluxe version Connect the illumination plug with the socket plug Connecting the loudspeaker 2 only Deluxe version Connect the loudspeaker plug with the loud speaker Connecting the Illumination Loudspeaker Italiano Elettricista Collegamento dell illuminazione 1 solo versione Deluxe Collegare la spina dell illuminazione alla presa Collegamento dell altoparlante 2 solo versione Delu...

Page 37: ...37 1 2 Deutsch Anschluss Beleuchtung Lautsprecher English Connecting the Illumination Loudspeaker Italiano Collegamento dell illuminazione altoparlante ...

Page 38: ...g tube clips A B Connecting the head shower Screw the earthing connection 8 at the head shower s threaded piece 7 Run the connection tube from the mixer 1 to the top cover 5 secure with cable ties Screw the connection tube s fitting piece 6 to the head threaded part 7 Installing the Connection Tubes Head Shower Italiano A Collegamento del generatore di vapore Collegare il tubo flessibile di raccor...

Page 39: ...39 1 2 3 4 5 6 7 A B 8 Deutsch Montage Verbindungsschläuche Kopfbrause English Installing the Connection Tubes Head Shower Italiano Montaggio dei tubi flessibili di raccordo soffione doccia ...

Page 40: ... 1 and screw it in using an SW 19 wrench Open the main water supply and check the angle elbows for tightness Screw the water tubes to the angle cleats 1 and secure them with an SW 24 wrench Note Only lockable angle cleats 1 may be used included in delivery Italiano Montaggio dei tubi flessibili di raccordo soffione doccia Collegare il tubo di mandata principale dell acqua Rendere stagna la curva d...

Page 41: ...41 1 Deutsch Montage Verbindungsschläuche Kopfbrause English Installing the Connection Tubes Head Shower Italiano Montaggio dei tubi flessibili di raccordo soffione doccia ...

Page 42: ...and water lines when drilling Place the steam shower in its mounting po sition and connect the drains Note When drilling Use extraction Position the steam shower vertically spirit level vertical application Drill fixation holes of Ø 6 mm 1 and in sert Ø 6 mm plugs Fix the final position using 4 x 40 fixation screws 3 Use 4 3 x 16 mm washers 2 Replace the foil from the side panes and the tray skirt...

Page 43: ...4 A B Ø 6 mm 8 8 9 Deutsch Montage Dampfdusche Dachabdeckung Seitenverkleidung English Installing the Steam Shower Roof Cover Side Casing Italiano Montaggio della doccia a vapore copertura del tetto pannello laterale ...

Page 44: ...he four pins in the eccentric elements 2 using the SW 2 socket wrench 3 Note The slide door must accurately close over the entire length of its hinge side The tilted position of the slide door can be adjusted by adjusting the eccentric bolt 2 with the SW 2 socket wrench Re fix the four threaded pins in the eccen tric elements using the SW 2 socket wrench Install the sealing lip 4 to the shower cab...

Page 45: ...45 1 2 1 2 2 3 2 3 A B C 4 Deutsch Schiebetür einstellen English Adjusting the Slide Door Italiano Regolazione della porta scorrevole ...

Page 46: ...on 3 Insert the sealing ring into the hose for the hand shower 4 Connect the hose to the hand shower Figure B The slide element wall bar can be regulated to be either hard or easily adjustable by turn ing the adjusting screw Installing the Tube Hand Shower Italiano Figura A 1 Applicare la guarnizione di tenuta nel tubo flessibile della doccia verso il raccordo a parete 2 Collegare il tubo flessibi...

Page 47: ...47 A B Deutsch Montage Schlauch Handbrause English Installing the Tube Hand Shower Italiano Montaggio del tubo flessibile doccia manuale ...

Page 48: ...emove the thermostat knob Vertically position the thermostat knob and plug it on red button 4 points upwards Tighten the thermostat knob 5 Note In cases of frost danger and for pipeline drain Uninstall the regulation unit open the selection knob and dry the installation unit by blowing compressed air through it water less Thermostat Adjusting Servicing Italiano Regolazione del termostato Applicare...

Page 49: ...49 1 2 3 4 5 Deutsch Thermostat einstellen warten English Thermostat Adjusting Servicing Italiano Regolazione manutenzione del termostatico ...

Page 50: ...h Shower Functions Setting Mistral 3 hand shower Fig A 1 Soft jet 2 Normal jet 3 Massaging jet Raindance head shower Fig B 1 Rain jet 2 Mix 1 3 Balance 4 Mix 2 5 Whirl jet Italiano Funzioni della doccia Doccia manuale Mistral 3 fig A 1 Getto delicato 2 Getto normale 3 Getto di massaggio Soffione doccia Raindance fig B 1 Getto a pioggia 2 Mix 1 3 Bilanciamento 4 Mix 2 5 Getto massaggio ...

Page 51: ...51 B A 3 2 1 1 2 3 4 5 Deutsch Brausenfunktionen English Shower Functions Setting Italiano Funzioni della doccia ...

Page 52: ...shower Single operation and combination with back shower or head shower B Head shower Single operation and combination with hand shower or eight side showers C 8 side showers nozzles Single operation and combination with head shower D 6 back showers nozzles Single operation and combination with hand shower or neck jets E 4 neck jets Single operation and combination with six back showers F Vario th...

Page 53: ...53 D A B C E F Deutsch Brausenfunktionen English Shower Functions Setting Italiano Funzioni della doccia ...

Page 54: ...he display Cursor indication flashes during selection and is illumi nated when in operating mode active program OFF display switched off ON display switched on Arrow key to the left Arrow key to the right Functions Key lock child lock Alarm key Back rain 8 x side showers interval operation option 4 x back showers interval operation option Neck jet 4 x neck nozzles interval operation option Steam b...

Page 55: ...55 1 2 3 4 5 6 7 8 A B Deutsch Elektronisches Bedienelement Comfort English Electronic Operating Element Comfort Italiano Elemento di comando elettronico Comfort ...

Page 56: ... illuminated when in operating mode active program OFF display switched off ON display switched on Arrow key to the left Arrow key to the right Functions Key lock child lock Alarm key Back rain 8 x side showers interval operation option 6 x back showers interval operation option Neck jet 4 x neck nozzles interval operation option Scotch shower cold water addition Steam bath Radio Chromo therapy El...

Page 57: ...57 1 2 3 4 5 6 7 8 A B Deutsch Elektronisches Bedienelement Deluxe English Electronic Operating Element Deluxe Italiano Elemento di comando elettronico Deluxe ...

Page 58: ...aging duration Time function water output time break Basic setting In the basic setting the Pharo side showers are subsequently activated from the bottom the top Switching the side showers on or off 1 Position the cursor on the Back rain symbol via the arrow key left or right Con firm your selection with the star key 2 The display shows the message ON active and a flashing figure 1 The 1 stands fo...

Page 59: ...r key Note Min duration 5 minutes Max duration 60 minutes Operation The settings can be changed during opera tion 1 Function duration Back rain Press the star key Press the plus or minus key for changes Confirm your selection with the star key After the confirmation the letter A followed by the side showers opening duration water output in seconds is shown 2 Set the side showers opening duration i...

Page 60: ...on with the star key 2 Set the time e g 20 minutes presetting via the plus or the minus key If the plus or minus key is held depressed the increase or decrease of the minute setting followed by a d is shown Confirm your selection with the star key Note Min duration 5 minutes Max duration 60 minutes The settings are stored in the system until the next programming If the power supply is interrupted ...

Page 61: ...f the plus or minus key is held depressed the increase or decrease of the minute setting followed by a d is shown Confirm your selection with the star key Note Min duration 5 minutes Max duration 60 minutes The settings are stored in the system until the next programming If the power supply is interrupted the settings are deleted To stop the operation position the cursor on the Neck jet symbol via...

Page 62: ...agrances can be filled into sieve insert of the aroma dispenser e g dried leaves or also cotton wool soaked in essential oils Switching on the steam bath activa tion 1 Close the door 2 Position the cursor on the Steam bath symbol via the arrow key left or right Con firm your selection with the ON OFF key 3 Set the time e g 20 minutes presetting via the plus or the minus key If the plus or minus ke...

Page 63: ...ed duration with the star key 7 The time and temperature settings can be changed during operation by operating the star key Confirm the new values with the star key Note After the set duration has expired the steam output is interrupted and the system returns to its idle position The heating up phase may take up to 60 minutes If the set temperature is not attained within this time the system retur...

Page 64: ...nection with Back rain Program 1 Each shower pair outputs warm water throug hout 70 and cold water throughout 30 of the shower duration Program 2 During the cyclical switch over cold and warm water is subsequently output by two separate shower pairs Program 3 After three cyclical system switch overs the showers only output warm water during two cycles and cold water during the third cycle 1 Positi...

Page 65: ...ogram selection Pr 1 Duration of the ON cycle 5 seconds presetting 5 sec shower open Cold water output duration pc 40 Cyclical switchover Shower 1 2 3 4 Cold water for 2 seconds 40 of the total time warm water for 3 seconds 60 of the total time Ref to program 2 1 Select the program Note With program 2 a personal setting need not be made The program automatically starts with outputting cold water v...

Page 66: ... Shower 2 warm water Shower 3 warm water Shower 4 cold water Ref to program 3 1 The display shows the message ci fol lowed by the number of warm water cycles 2 to 9 2 Use the plus or minus key to set a value and confirm your selection with the star key Note A warm water cycle is always followed by a cold water cycle The settings are stored in the system until the next programming If the power supp...

Page 67: ...er 1 cold water Shower 2 cold water Shower 3 cold water Shower 4 cold water Note In addition one of the following functions must be activated Back rain function whole body massage back showers function back massage Neck jet function neck and back massage 3 Select the Scotch shower symbol via the ar row key left or right and confirm your selection with the ON OFF key After the operating time has ex...

Page 68: ...or minus key Confirm your selection with the star key Note 7 x memory locations unassigned Further assignment same procedure Calling up radio stations programs 1 Position the cursor on the Radio symbol via the arrow key left or right Confirm your selection with the ON OFF key 2 Press the star key and select the desired program radio station 1 8 via the arrow key left or right Confirm your selectio...

Page 69: ...e following cycles can be selected C1 Presentation cycle C2 Relaxing cycle C3 Stimulating cycle C4 Regenerating cycle C5 Refreshing cycle C6 Exhilaratory cycle C7 White light Select the desired light via the plus or minus key To stop the function position the cursor on the Chromo therapy symbol via the Arrow key and press the ON OFF key The presentation cycle intended for trade fairs and exhibitio...

Page 70: ...onger to achieve the chosen ca bin temperature like until now if hot water comes out of the steam nozzle during the operating time Decalcifying Abb B turn off the elekrical supply disassemble the lefte side Pull out the water level sensor from the box of steam generator pour in Hansgrohe s De calcyfiying Agent 90901000 approx 2 l and wait circa 1 hour Operating Element Deluxe To drain the steam ge...

Page 71: ...71 A 2 1 4 3 90901000 B 1 2 3 4 Deutsch Störungen und Abhilfen English Failures and Rectifications Italiano Anomalie e rimedi ...

Page 72: ...ectrician Work at the electrical system may only be carried out by expert personnel 1 Make sure the power supply is switched on operable 2 Power supply available Check the power supply connection Danger Disconnect the power supply before opening the control box disconnect the steam shower from the power supply Italiano Anomalie e rimedi Controllo dell impianto elettrico Se si presentano anomalie d...

Page 73: ...73 Deutsch English Italiano ...

Page 74: ...4 Hansgrohe Postfach 1145 D 77761 Schiltach Telefon 49 0 78 36 51 1282 Telefax 49 0 7836 511440 E Mail info hansgrohe com Internet www hansgrohe com Adressen 03 06 Form Nr 9 05036 03 Addresses Indirizzi ...

Reviews: