Für den Installateur
For the Plumber
Pour l’installateur
Para el instalador
Standard installation Back-to-back installation
Standard installation:
Shower only
Back-to back installation:
Tub and shower
Floor line
Back-to back installation:
In Back to back installations, cartridge must be rotated 180° to ensure proper valve operation.
Rough-In
3 port valve shower only:
Position valve with outlet up. Finished wall must be within the dimensions shown on
finished wall template.
4 port valve, tub and shower:
Position valve with shower outlet marked „S“ up and the tub outlet marked „T“ down.
Finished wall must be within the dimensions shown on finished wall template.
Finished wall template must remain intact for finished wall surface measurements
and as a template for plastering and / or tilling.
It is not necessary to remove the pressure balancing cartridge from the valve during
normal soldering of connections, using propane-butane gas.
Do not use OXYGEN-ACETYLENE!
When soldering connections, do not use excessive heat!