BS03 fixed gas detector operation manual
6
Method 3:
If there is 1" to 2″ (diameter) pipe, the user can use 2 U-type
bolts to fix the hanging plate on the pipe, and then fix the detector onto
the plate. Or, the user can first fix the detector onto the plate and then fix
the plate on the pipe.
5. Wire connection
Note
: Electricity power must be cut off before wire connection.
Wire connecting steps:
1)
Screw down the cover in counter-clockwise way. Then use a cross-type
screw to screw down the 3 bolts and take off the display PCB.
2)
Screw down the pipe connector in counter-clockwise way. Take out the
explosion-proof pad. In turns, put 3-line wire to the internal of the
enclosure through the pipe connector, compaction circle, air-proof
closing plug and the wire connection hole. According to the
explosion-proof requirement, please don't take out the explosion-proof
closing plug from the unused wire connection holes. Please don't throw
away any part inside the enclosure or the PCB.
3)
All the wires should be connected to the terminals. The terminal
instruction is as follows:
Summary of Contents for BS03
Page 15: ...BS03 fixed gas detector operation manual 12...
Page 17: ...Attachment 1 Address code settings...
Page 18: ......
Page 19: ......
Page 20: ......