3
Preface
Before installing the product, please read this manual fully and make sure you follow
the instructions in it.
The content of the manual is maintained latest as of the date when it is written. The
product information is subject to change without prior notice to users.
If you are uncertain about any requirements, recommendations or safety procedures
described in the manual, please, consult with Hanwha Precision Machinery Co.
Users are responsible for any damages caused by their misuse neglecting these
instructions below.
Note
Some of illustrations in the manual intends to help users in
understanding the system concepts and installation issues. The actual
product may differ from the manual.
Please keep this manual in a safe place for future reference.
Voltage: 100~240VAC, 50/60Hz(1kW)(It should be connected to the
neutral cable which is connected with grounding line with one phase of
the 3 phase cables.)
Status of load installation: Load is not exceeding the payload of Robot.
Please check the grounding line connection in plant and operating cell.
(It can be refer to section 3.3 to check the location of grounding line.)
- Any plants and cells with the inappropriate grounding line may have
the negative influence such as noise on the communication line between
robot and system.
- Especially, if robot is installed with the equipment requiring large
current such as heater, motor, separate additional grounding line is
required.
Summary of Contents for HCR-3
Page 1: ...HCR 3 Collaborative Robot User Manual Aug 2019 V 2 001...
Page 2: ......
Page 99: ...Chapter 8 Safety Settings 99 3 Press the OK button...
Page 186: ...Chapter 15 Maintenance 186 4 When the confirmation window appears press YES...
Page 190: ...190 Appendix B Certification Safety...
Page 191: ...191 MD Machinery Directive...
Page 192: ...192 LVD Low Voltage Directive...
Page 193: ...193 EMC Electro Magnetic Compatibility...
Page 194: ...194 Appendix C Dimensions for Installation...
Page 200: ......
Page 201: ......