background image

  

 

           

 

BUILT-IN GAS FIRE BURNER KIT 

 

              

ASSEMBLY INSTRUCTIONS AND SAFETY GUIDE 

U

 

10BU

SR2201BI/I2+, SRR2201BI/I2+ &  

SR4001BIS/I2+, SR4001BIR/I2+ 

                                                                                                

0063/YY

SR2201BI/I2+ &SRR2201BI/I2+ Preferential 

Σ Qn(Hs)= 6.5 kW, 473 g/h  I3+(28-30/37), I3 B/P(30), I3 B/P(50), 

I2L & I2H/I2E/I2E+ 
SR4001BIS/I2+ & SR4001BIR/I2+ Preferential 

Σ Qn(Hs)= 12 kW, 873 g/h  I3+(28-30/37), I3 B/P(30), I3 B/P(50) 

& I2L 
SR4001BIS/I2+ & SR4001BIR/I2+ Preferential 

Σ Qn(Hs)= 13 kW, 946 g/h  I2H/I2E/I2E+ 

BE, CY, CZ, EE, GR, IT, IE, PT, ES, LU, GB, FR, IS, LT, PT, SK, CH: Cat. I

3+ 

Butane(G30)=28~30 mbar, 

Propane(G31)=37mbar, Injector SR2201BI/I2+ & SRR2201BI/I2+:1.2 mm  SR4001BIS/I2+ & SR4001BIR/I2+: 
1.65mm   
CY, CZ, DK, EE, FI, GR, LV, LT, LU, MT, NL, NO, SK, SI, SE, TR, HU: Cat. I

B/P(30)=Butane, propane or 

their mixture at 30mbar, Injector SR2201BI/I2+ & SRR2201BI/I2+: 1.2 mm  SR4001BIS/I2+ & 
SR4001BIR/I2+:1.65mm 
AT, DE, SK, CH: Cat. I

B/P(50)= Butane, propane or their mixture at 50mbar,  Injector SR2201BI/I2+ & 

SRR2201BI/I2+: 1.02mm  SR4001BIS/I2+ & SR4001BIR/I2+: 1.45mm  
AT, BE, CH, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LT, LU, LV, NL, NO, PL, PT, RO, SE, SI, SK: Cat. 
I

2L

 Natural Gas(G25) at 25mbar, Injector SR2 & SRR2: 1.95mm  SR40, 

SR40: 3.0mm and I

2H

/I

2E

/I

2E+

 Natural Gas(G20) at 20mbar, Injector SR2 & SRR2: 

1.72mm  SR40 & SR40: 3.0mm    
“  Only  nationally  approved  hose  and  regulator  corresponding  to  the  appliance  category  and  pressure 
must be used ” 
This manual is for:  

PIN NO.:  0063CO7314 

FOR OUTDOOR USE ONLY 

Read the instructions before using the appliance. Keep the instructions for future reference. 

Warning: Accessible parts may be very hot, keep young children away. 

Summary of Contents for 4001BIS/I2 Plus

Page 1: ...r their mixture at 30mbar Injector SR2201BI I2 SRR2201BI I2 1 2 mm SR4001BIS I2 SR4001BIR I2 1 65mm AT DE SK CH Cat I3 B P 50 Butane propane or their mixture at 50mbar Injector SR2201BI I2 SRR2201BI I...

Page 2: ...r kit unattended while using 6 In the event of a gas leak the appliance shall not be used or if alight turn off gas supply at the LPG cylinder or the nearest main shut off valve of city network gas An...

Page 3: ...ce The dress guard is not supplied with the appliance the installer shall inform the user of the local rules in force and advise the fitting of the same dealer s or qualified installer s dress guard H...

Page 4: ...I2E I2E 3 0mm 13 kW 946 g h The marking on the injector for example 1 20 indicates that the size of injector is 1 20mm LP Gas Regulator A gas regulator confirming to the national standard must be fit...

Page 5: ...Igniter 1 29 Plate Control panel 1 09 Burner head 1 30 Bracket Burner Bowl 1 10 Leakage Protector 1 31 Frame 1 11 Windpipe 1 32 Screw M4F07 4 12 Nut Pilot Igniter 1 33 Nut M4 4 13 Washer 1 34 Screw M...

Page 6: ...iter 1 29 Plate Control panel 1 09 Burner head 1 30 Bracket Burner Bowl 1 10 Leakage Protector 1 31 Frame 1 11 Windpipe 1 32 Screw M4F07 4 12 Nut Pilot Igniter 1 33 Nut M4 4 13 Washer 1 34 Screw M6F41...

Page 7: ...6 SR2201BI I2 SR4001BIS I2 series exploded...

Page 8: ...7 SRR2201BI I2 SR4001BIR I2 series exploded...

Page 9: ...d inlet fitting as shown in FIG 01 FIG 02 below SR2201BII2 SRR2201BII2 SR4001BISI2 SR4001BIRI2 Attach the hose to the manifold inlet fitting with a national standard NG connector and secure the hose t...

Page 10: ...rner kit onto the opening of your wooden table as shown in FIG 01 NOTE You may need to use and attach the optional table support bracket kit as shown in FIG 02 to secure the slats you saw off Adjust a...

Page 11: ...perpendicular to the igniter box Lay the other logs in a teepee configuration over the first log It is important that the logs not lay directly on top of the burner By blocking the burner it will imp...

Page 12: ...11 SR4001BIS I2 SR4001BIR I2...

Page 13: ...e ground with screw Attach the manifold inlet fitting with the national standard NG connector supplied Connection of the NG supply to the appliance inlet should be made by a qualified installer Note F...

Page 14: ...NSTRUCTIONS 74BUINSTALLATION OF THE LID When the appliance is not in use disconnect and take off the logs and close the lid to use as a normal table NOTE Be sure unit is cool before touching any of th...

Page 15: ...ES Turn off the gas supply at the cylinder or main shut off valve of city network gas Do not try to light any appliance Do not touch any electrical switches Do not use any phone including cellular pho...

Page 16: ...e area clear and free from combustible materials gasoline and other flammable vapors and liquids Installation and repair should be done by a qualified service person The appliance should be inspected...

Page 17: ...regulator for details regarding fitting 3 Test for gas leaks Do a leak test each time the cylinder is installed whether or not it has been filled Check all other joints at least once a year lf the hos...

Page 18: ...areas where the hose may be subjected to accidental damage 7 Open tank valve fully Turn the on off valve at the unit to the off position to pressurize the hose assembly Use a soapy water solution to...

Page 19: ...y part has been under water Immediately call a qualified service technician to water WHAT TO DO IF YOU SMELL GAS Turn off the gas supply at the cylinder or main shut off valve of city network gas Do n...

Page 20: ...s to ensure it is not cracked or damaged in any way INSPECTION AFTER REPAIR Any repairs must be performed by a qualified installer service agency or your gas provider 1 Check all the joints 2 Smell al...

Reviews: