3
8
Exchange of pressure foot
3-2-11
1. Referring to [3-2-1 Exchange of crank], remove Front
coverand Thread tension.
2. The needle which you insist to exchange pressure foot
should be located at offset position from bed.
(1) Press
key on control box.
(2) Turn gear with finger.
3. Remove pressure foot.
4. Install good pressure foot.
5. Adjust height of pressure foot to finish.
Please refer to [3-2-10 Check of height of pressure foot].
Summary of Contents for HCH-701-30
Page 1: ...Maintenance Manual for Embroidery Machine HCH 701 30 Version 2 4 HappyJapan Inc ...
Page 132: ...128 Electrical connection diagram 5 ...
Page 133: ...129 Electrical connection diagrams 5 ...
Page 134: ...130 List of electrical connection diagrams 5 ...
Page 137: ...130c HCD81222 LCD CE MX 基板組 ...
Page 138: ...130d HCD8116 TP switch board ass y 3 82 7 32 7 387487 2487 ...