9
8
Exchange of Y carriage belt
3-7-4
7. Remove Bush guide.
8. Exchange belt.
9.
Pull opposite side bush guide to arrow marked direction
until linear bush touches tension base.
10. Set belt to belt groove of guide frame base.
<Important>
Exchange it so as not to break groove and
convex on belt.
Do not use center groove of Y belt support to avoid
overlap both belt.
Y belt support
11
.
Pull both side bush guide until linear bush touches
tension base, then fix arrow marked screws on Y belt
support.
Summary of Contents for HCH-701-30
Page 1: ...Maintenance Manual for Embroidery Machine HCH 701 30 Version 2 4 HappyJapan Inc ...
Page 132: ...128 Electrical connection diagram 5 ...
Page 133: ...129 Electrical connection diagrams 5 ...
Page 134: ...130 List of electrical connection diagrams 5 ...
Page 137: ...130c HCD81222 LCD CE MX 基板組 ...
Page 138: ...130d HCD8116 TP switch board ass y 3 82 7 32 7 387487 2487 ...