7
5
4-4-3 Exchange of rotary hook shaft
1. Take hook shaft out
1-1. Take hook retainer out.
(Hexagon socket button head screw : M3-5)
(Plain washer : M3)
1-2. Loosen screw and take hook out.
1-3. Loosen screw of collar.
(Hexagon socket set screw : M4-4 2 pcs)
Please loose screw enough, because shaft has flat face.
1-4. Take cover of bed.
(Screw for needle plate : 2 pcs)
1-5. Lossen screws (see below picture) total 4 pcs.
(Hexagon socket set screw : M4-4 4 pcs)
1-6. Take gear out.
1-7. Pull shaft out.
Take hook shaft out has finished.
Summary of Contents for HCR3-1502
Page 1: ... Maintenance Manual for Embroidery Machine HCR3E SERIES Version 1 2 HappyJapan Inc ...
Page 104: ...105 4 7 3 Adjustment of timing detecting unit 8 Finally put the cover back on ...
Page 107: ...107 ...
Page 172: ...172 E7 Electric system diagram E7 1 Pulse motor driver PMD wiring ...
Page 173: ...173 E7 2 Pulse motor driver PMD setup ...
Page 174: ...174 E7 3 Inverter wiring ...
Page 175: ...175 E7 4 Electrical connection diagram ...
Page 176: ...176 ...
Page 177: ...177 ...
Page 178: ...178 E7 5 List of electrical connection diagram ...
Page 179: ...179 ...
Page 180: ...180 E7 6 Explanation of function clrcuit board HCD8122 LCD CE MX Board Ass y ...
Page 181: ...181 HCD8116 TP SW Circuit Board Ass y CN No Function CN1 Switch output LED input ...