99
4-7-1 Exchange of main shaft timing belt
1. Remove bed cover B.
2. Let a disk reach 25 degrees.
3. Loosen two (2) pieces of screws indicated with red
arrows.
4. Remove six (6) pieces of screws, and then remove a left
cover.
5. Loosen a nut indicated with a red arrow by using a 7mm
spanner.
6. Rotate two (2) pieces of screws mounted on a tension plate
by approximate 180 degrees to loosen them.
Bed Cover B
Nut for tension adjustment
Tension Plate
Summary of Contents for HCR3-1502
Page 1: ... Maintenance Manual for Embroidery Machine HCR3E SERIES Version 1 2 HappyJapan Inc ...
Page 104: ...105 4 7 3 Adjustment of timing detecting unit 8 Finally put the cover back on ...
Page 107: ...107 ...
Page 172: ...172 E7 Electric system diagram E7 1 Pulse motor driver PMD wiring ...
Page 173: ...173 E7 2 Pulse motor driver PMD setup ...
Page 174: ...174 E7 3 Inverter wiring ...
Page 175: ...175 E7 4 Electrical connection diagram ...
Page 176: ...176 ...
Page 177: ...177 ...
Page 178: ...178 E7 5 List of electrical connection diagram ...
Page 179: ...179 ...
Page 180: ...180 E7 6 Explanation of function clrcuit board HCD8122 LCD CE MX Board Ass y ...
Page 181: ...181 HCD8116 TP SW Circuit Board Ass y CN No Function CN1 Switch output LED input ...