8.
CHECK FOR DAMAGED PARTS. Before using this product, carefully check
that it will operate properly and perform its intended function. Check for
damaged parts and any other conditions that may affect its operation. Replace
or repair damaged or worn parts immediately.
9.
REPLACEMENT PARTS AND ACCESSORIES. When servicing, use only
identical replacement parts. Only use accessories intended for use with this
product. Approved accessories are available from Harbor Freight Tools.
10.
MAINTAIN PRODUCT WITH CARE. Keep this product clean and dry, and
moving parts lightly lubricated for better performance. Keep product dry, clean
and free from oil, grease, and solvents.
11.
USE THE RIGHT PRODUCT FOR THE RIGHT JOB. Do not attempt to force
a small tool or attachment to do the work of a larger industrial tool. There are
certain applications for which this tool was designed. It will do the job better and
more safely at the rate for which it was intended. Do not modify this tool and do
not use this tool for any purpose other than which it was intended.
12.
WORKING WITH GLUE. Always be careful of fumes and always have proper
ventilation. Keep glue away from children.
UNPACKING
When unpacking, check to make sure all parts shown on the Parts List (page #5) are
included. If any parts are missing or broken, please call Harbor Freight Tools at the
number shown on the cover of this manual as soon as possible.
SKU 90416
PAGE 3
Using the Ratcheting Strap Clamp for Laminate Flooring:
This Ratcheting devise will work as a floor clamp to aid you in laying your laminate
floor panels. This clamp can only be used to tighten a total length of 14 ft. of floor
panels.
1.
Place the laminate flooring panels in accordance with the manufacturer’s
instructions.
2.
Lay 3 panels as instructed, leaving a space for expansion around the edges of
the floor.
3.
With the Metal Plate (#1) pre-assembled with the yellow Strap (#2), insert over
the edge of the first panel of laminate flooring.
4.
Lay the yellow Strap (#2) across the flooring area. With the Ratchet (#3), hook
under the third floor board.
See Figure 1.
#2 Strap
#1 Metal Plate
Figure 1
#3 Ratchet
Flooring
Boards
First
Second
Third