Page 10
SKU 94515
for technical questions, please call 1-800-444-3353.
View from above
to
corner
Stud (1)
left
doorway
Stud (6)
front floor plate (17)
to
corner
Stud (29)
Right
doorway
Stud (7)
5.
Install the Left and Right Doorway Studs (6, 7) to the outside of the frame so that
they rest flat against the frame. Their orientation should be the same as shown
above. Slide a Bolt (43) into each slot for later Front Brace (23) assembly. Slide a
Hold-Down Connector (55) under the base and over the Bolt at each bottom con-
nection, do not secure with a Nut (52) until the next step.
Remove the bottom Bolt from the Corner Brackets (13) at the front of the greenhouse.
6.
Install the Front Diagonal Braces (25) with their flanges facing inward to the bottom
hole of the Brackets on the inside using Bolts (43). Attach the bottom of the Front
Diagonal Braces (25) to the Bolt left exposed on the Floor Plate (17) from the last
step.
(See figure c.)
Remove next bolt up from the front Corner Brackets (13). Connect the Front Braces
7.
(23) to the exposed hole. Connect the loose ends of the Front Braces (23) to the
Doorway Studs (6, 7), using the Bolts (43) included in the Doorway Studs (6, 7) in
step 5, above.
(See figure c.)
8.
Attach the Door Slide Support (19) to the Front-Left Crown Beam (3) using the Long
Door Support Bolt (38) and Nut (52), with the Door Support
Spacer (39) between the Support and the Stud.
(See figure c,
inset, and diagram to the right.)
The frame should now rest square. Measure diagonally from cor-
9.
ner to corner at the top. If the measurements are not equal, adjust
the frame as needed until square. Some Nuts (52) may need to
be temporarily loosened to adjust the frame properly.
Place the Gutter End Caps (48) onto the ends of the Side Ceiling Plates (36) oriented
10.
with a gap in the bottom to allow water to drain out of the gutters.
19
23
38
3
39