Page 8
SKU 94515
for technical questions, please call 1-800-444-3353.
Assembling the Roof frame
figure b
2
3
4
5
35
12
14
1.
Assemble the roof frame to the side of the greenhouse first. Attach the Front-Right
and Front-Left Crown Beams (2, 3) to the outside of the Crown (35) with the angled
edges towards the top. See diagram below right, viewed from under the Crown,
facing forward.
Attach the Top Doorway Beam (12) and Door Rail (14)
2.
assembly to the outside (opposite the Crown) of the Front-
Right and Front-Left Crown Beams (2, 3). The rounded
edge on the Door Rail should face upward.
Attach the Rear Crown Beams (4,5) to the Crown (35) in
3.
the same fashion as the Front Crown Beams in step 1.
Attach a Corner End Cap (47) onto the outer end of each
4.
Crown Beam (2-5). Cover the gaps between the Crown Beams (between 2-3 & 4-5)
with a Peak Cap (54) in each. You may desire to use some silicone (not included)
to secure the Peak Caps (54) in place.
With an assistant, lift the Crown Assembly and place the Crown Beams (2-5) on
5.
top of the Corner Brackets (13).
(See figure b.) Secure each corner in place with
the Crown Beams on the outside of the Corner Brackets.