27
Assembly
Preassembly information
The sprayer is supplied ex-works in shipping packages (SP). Number
of SP’s per sprayer varies depending on model.
As this covers all BS/HR models, please note the fittings covering
exactly your model.
NOTE: Removal of the plastic bag covering the tank is easiest done
before assembly.
Some components are shipped within the tank. Check inside.
To verify connection of hoses, a function diagram is included on the
last page.
Packaging information
Materials used for packaging are environmentally compatible. They
can be safely deposited or they can be burnt in an incinerator.
Recycling
Cardboard: Can recycle up to 99% and therefore should be put into
the waste collection system.
Polystyrene foam: Can be recycled. Fluorocarbons (CFC) not used in
foam production. Polyethylene: Can be recycled.
NOTE: Use O-rings where indicated. Lubricate them with non-mineral
lubricant (silicon oil) before assembly. Where O-rings are not indicated,
use sealing tape.
Check that all shipping packages are present.
T159-0001
Summary of Contents for Boss Series
Page 1: ...BOSS HERON Instruction book 673791 GB 04 2002 www hardi international com...
Page 18: ...16 1 X 40 2 A X 8 A X 40 3 X 40 17 6 9 T200 0001...
Page 19: ...17 4 X 40 5 X 40 X 1000 or once a year 16 16 HR only...
Page 47: ...45 1202 foot A10...
Page 48: ...46 A12 1302 foot...
Page 49: ...47 Unit BK 180K 92 B9...
Page 50: ...48 B10 Distributor BK180K 92...
Page 51: ...49 Damper HJ73 B300...
Page 52: ...50 D2 SB 6 8 10 m...
Page 53: ...51 Boom tube TRIPLET SNAP FIT D904...
Page 54: ...52 H106 PS 300...
Page 55: ...53 TPS 800 H107...
Page 56: ...54 H108 PU TPS 800...
Page 58: ...56...
Page 60: ...HARDI INTERNATIONAL A S Helgesh j All 38 DK 2630 Taastrup DENMARK...