6 - Maintenance
146
4.
Turn the eccentric bolts (B) and (D) the same way simultaneously
to obtain the right vertical alignment.
ATTENTION! The upper eccentric bolt adjusts only half of the
adjustment, and the lower eccentric bolt adjusts the other half.
It is important to adjust the eccentric bolts simultaneously and in
same direction!
5.
Tighten the nuts (A) and (C) again after alignment.
6.
Fold the boom to see if it hits and rests correctly in the transport
brackets.
7.
If necessary to adjust, slightly loosen the nuts (A) and (C) again.
8.
Turn the eccentric bolts (B) and (D) simultaneously in opposite
directions, until the boom rests correctly in the transport bracket.
Clearance between bracket and boom must be 8 mm.
9.
Use a torque wrench to tighten the nuts (A) and (C) to 250 Nm.
Summary of Contents for MEGA VPZ MASTER
Page 4: ...1 EU Declaration 4...
Page 10: ...Table of Contents 10...
Page 42: ...2 Safety Notes 42...
Page 68: ...3 Description 68...
Page 118: ...5 Operation 118...
Page 121: ...6 Maintenance 121 Lubrication Plan Boom Centre Close up of Glide Shoes to be Lubricated...
Page 172: ...8 Technical Specifications 172...
Page 176: ...Index 176...
Page 178: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...