5 - Operation
65
Operating the control unit while spraying
The switches of the spray control unit control the following functions:
1.
Power ON/OFF. Turns the spraybox power on or off.
2.
Spray pressure regulation. Regulates the main spray pressure.
3.
Main valve ON/OFF. Turns all sections on or off. Lever up is OFF and
down is ON.
4.
End nozzle (Left/OFF/Right). If end nozzles are fitted, they can be
turned on for each side. Middle position is OFF.
5.
Foam marker blob interval. Regulates the blob interval for the
optional foam marker.
6.
Foam marker (Left/OFF/Right). Turns the optional foam marker on
for each side. Middle position is OFF.
7.
Section valves. Turns single sections on or off. Lever up is OFF and down is ON.
8.
Optional function (A/OFF/B). If extra equipment is added, it can be controlled from here. Middle position is OFF.
•
In order to close the entire boom, switch main ON/OFF (3) to OFF
position. This returns the pump output to the tank through the
return system. The diaphragm Non-drip valves ensure
instantaneous closing of all nozzles.
•
In order to close one or more sections of the boom, switch the
relevant distribution valve (7) to off position (upwards). The
pressure equalisation ensures that the pressure does not rise in the
sections that remain open.
•
On the sprayer the suction valve should be turned toward “Suction
from Main tank” and the pressure SmartValve should be turned
toward “Spraying”. Turn the agitation valve to “Agitation” if
necessary.
Quick reference - Operation
In the following diagrams handle positions for different options are described.
Summary of Contents for NAVIGATOR DELTA
Page 4: ...1 EC Declaration 4 ...
Page 10: ...Table of Contents 10 ...
Page 14: ...2 Safety notes 14 ...
Page 32: ...3 Description 32 ...
Page 54: ...4 Sprayer setup 54 ...
Page 74: ...5 Operation 74 ...
Page 76: ...6 Maintenance 76 Boom lubrication oiling plan ...
Page 104: ...7 Fault finding 104 ...
Page 120: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...