117
Index
Index
Numerics
10 Hours Service
In-Line Filter, 92
Nozzle Filters, 93
Spraying Circuit, 93
100 Hours Service
Re-tightening Boom, 93
250 Hours Service
Hoses and Tubes, 93
Hydraulic Circuit, 93
50 Hours Service
Greasing the Pump, 93
Transmission Shaft, 93
A
Adjustment
3-Way Valve, 97
Agitation, 73
Before Resuming a Spray Job, 73
valve, 44
Agitation valve, 44
Anti-Corrosion Oil, 53
B
Before Operation, 53
BK
Control Unit, 43
Diagram, 45, 47
Bolts, Tightening, 90
Boom, 49, 63
100 Hours Service, 93
Lubrication & Oiling Plan, 87
Manoeuvring, 65
Readjustment, 98
Re-tightening, 93
Tilt, 65
Venting Hydraulics, 100
Brakes, 111
C
Calculating Weights, 54
Canister, 51
Centre of gravity, 55
Check
Cone for EVC Distribution Valve, 96
Cone for Pressure Regulation Valve, 96
ChemFiller, 41
Filling Powder Chemicals, 72
Rinsing, 74
Choice of Restrictor, 61
Clean Water Tank, 43
Cleaning, 25, 35, 75
External Cleaning Device, 51, 83
Full Internal, 81
Maintenance of Filters, 79
Outside, 81
Quick Reference, 77
Rinsing Tank and Rinsing Nozzles, 80
Standard, 78
Tank and Liquid System, 79
Use of Detergents, 79
Connector
Cigar, 60
Traffic Light, 60
Container Cleaning, 74
Device, 71, 72
Control Unit
BK, 43
Brackets, 59
EVC, 43
D
Declaration of Conformity, 115
Detergents, 79
Diagram
Basic Liquid System (BK Operating Unit), 45
Basic Liquid System (EVC Operating Unit), 46
Liquid System with Options (BK Operating Unit), 47
Liquid System with Options (EVC Operating Unit), 48
Diaphragm
Renewal, 95
Dilution
In-field, 80
Dimensions, 107
Weight, 108
Disposal, 25, 112
Drain Valve, 83
Driving On Hilly Ground, 56
E
Electrical Connections, 59, 113
EVC Junction Box, 114
SPRAY II, 113
Electrical System, 32
Electrical Valve Control, 43
Emergency Operation
Liquid System, 106
Environmental
Info, 63
Precautions, 34
Protection, 25
Equipment, 50
Personal Protective, 14
Safety and Protection, 18
EVC
Control Unit, 43
Diagram, 46, 48
Distribution Valve, 96
Operating Unit, 114
External
Cleaning Device, 51
Summary of Contents for NK MB Series
Page 8: ...1 Identification 8 ...
Page 52: ...3 Description 52 ...
Page 62: ...4 Sprayer Setup 62 ...
Page 84: ...5 Operation 84 ...
Page 87: ...6 Maintenance 87 Boom Lubrication Oiling Plan Lift Lubrication Oiling Plan ...
Page 116: ...9 EC Declaration 116 ...
Page 120: ...Index 120 ...
Page 122: ...HARDI INTERNATIONAL A S Helgeshøj Allé 38 DK 2630 Taastrup DENMARK ...