We recommend tex screwing the leveling legs to sleepers once the mill has been made level. So before tex
screwing the mill to the sleepers, it is highly recommended that you run a string line down
both
sides of the
mill, to make sure the track is straight and level. (The string line is in pink in the above picture).
The red arrows indicate where the locations of the leveling legs are. There are six per 2 metres of track. 18 in
total on the machine. On the intermediate bunks the leveling legs alternate. We recommend placing the mill
leveling legs on sleepers running left to right as shown above. You need to make sure the bunks are also level.
To do this you use a spirit level going left to right on top of each bunk and also using a string line down the
length of the track. The string line needs to be approx. 10mm
above
the bunks.
Summary of Contents for GT26
Page 39: ...Page 39 DIAGRAM ...
Page 40: ...Page 40 DIAGRAM ...
Page 41: ...Page 41 DIAGRAM ...
Page 42: ...Page 42 DIAGRAM ...
Page 43: ...Page 43 DIAGRAM ...
Page 44: ...Page 44 NOTES ...
Page 45: ...Page 45 ...