HARDY MANUFACTURING CO., INC (MODEL LC300, LC500 & LC2500)
PAGE 15
Heater with Hull and stacks
removed to show connections.
Air Flow
Air Flow
Air Must be
Filtered before
passing through
Heating Coil.
Vertical
Flow
System
The pipe that will supply the heating system is connected to the under side of the
pump. This pump is located on the right hand side of the heater (noted by # 3 in
diagram.)
The pipe that will carry the return water from the heating system is connected to the
3/4” brass tee located at the bottom left hand corner of the heater (noted by # 4 in
diagram).
These two (2) lines will go to the heat exchanger coil that mounts into the duct work of
your forced air heating system. For best results connect the line from the pump to the
fitting of the heat exchanger closest to the side of the heat exchanger that the air is
leaving. Connect the return line to the heat exchanger on the side that the air is
entering.
Water pipes must be designed for hot water service (ex. copper, cpvc, or Pex.)
Pipes should be installed in a 4” watertight pipe or some other type of insulating
means to prevent heat loss from heater to heating system. Use only copper,
brass, or stainless steel fittings. Do not use galvanized or black iron.
3-1
Instructions for Forced Air Systems
SECTION III
PLUMBING INSTRUCTIONS
3
4
Summary of Contents for LC2500
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ... MODEL LC300 LC500 LC2500 viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ......
Page 71: ......
Page 72: ......