background image

PART #

DESCRIPTION

1.

CSC-BLOCK

LATCHTAP BLOCK

2. 41S-6

BRASS FLARE NUT

3. SC-1

STAINLESS TUBING

4. 68-6

BRASS 3/8”FIP X 3/8” COMPRESSION

5. N-6X1.5

3/8 X 1.5 PIPE

6. LTHS

LATCHTAP HEAT SHIELD

7. SPC-EH

KNOB EXTENSION HANDLE

8. RC-S6V-ST

REMOTE CONTROL

9. (4)AA Batteries

NOT PICTURED

10.A23 Battery

NOT PICTURED

INSTALLATION

1.

Use the CPE-PO (Safety Pilot Valve Kit) Installation

Instruction to properly install the Extension Connector and
Pilot Assembly to the Ember Burner.
2. Attach the N-6X1.5 to the side port of the CSC-BLOCK.
3. Attach the other end of the N-6X1.5 to the outlet side of
the CPC-C
4. SC-1 assembly – Slide the 41S-6 onto the SC-1with both
flared ends going the same direction.

Attach the 68-6

compression fitting to the SC-1 by sliding the nut and then
the ferule from the 68-6 onto the SC-1 then threading and
tightening the compression end of the 68-6 to the nut.
5. Attach the 68-6 end of the SC-1 assembly to the back port
of the CSC-BLOCK.
6. Verify that the brass elbow 50-6-8 is attached to the
ember burner and the flared end is facing forward. Attach
and tighten the 41S-6 end of the SC-1 to the 50-6-8.
7.

Attach the wires on the CSC-BLOCK to the Switching

Device included in the SCK kit.
8. Assure the switching device is located as close to the
front opening of the fireplace and as far away from the
Ember Burner pan as possible.
9. Follow the Lighting Instructions in the CPE-PO Installation
instruction for proper lighting procedures.

HARGROVE GAS LOG

SERVOTAP KIT (SCK-RC)

INSTALLATION INSTRUCTION

1

3

2

8

NOTE: This kit is used to upgrade a Manual Safety Pilot Kit (CPE-PO) to function using a
switching device (remote control). Follow the Installation Instructions in the CPE-PO kit for
proper installation and operation.

SERVOTAP KIT INSTALLED

CLC-BLOCK

N-6X1.5

CPC-C
SAFETY
PILOT
VALVE

(included in
CPE-PO kit)

USE THE PARTS LISTED BELOW WITH PARTS IN THE CPE-PO PILOT KIT

EMBER
BURNER

PILOT
ASSEMBLY

4

PARTS INCLUDED IN

SAFETY PILOT KIT

LTHS

CSC-BLOCK

HEAT SHIELD INSTALLATION

5

6

41S-6

SC-1

68-6

50-6-8

7

IMPORTANT: GAS WILL NOT FLOW TO THE

EMBER BURNER UNTIL THE LATCHTAP (CLC-

BLOCK) IS ENGAGED USING ONE OF THE

SWITCHING DEVICES.

f i r e - p a r t s . c o m

Reviews: