40
CLR Mooring Winch
Installation and Maintenance Manual - Mod.A
8. Unscrew 4 nuts and remove 4 washers to remove the base from the deck (opposite procedure of
the section #10 of this manual):
9. Flush deck operation - Remove the drum support and extract the top and the coloumns: