41
CLR Mooring Winch
Installation and Maintenance Manual - Mod.A
11. Bench operation - Extract the base from the deck and unscrew n°8x M6x30 socket head screws
to remove the base from the top:
10. Flush deck operation -Unscrew the coloumns from the top:
9.4 Assembly
Assemble the winch in the reverse order of the sequence in the section of the disassembly.
NOTE!
Once the screwing of the columns is completed, the distance between flange and the head of
the screws is an essential design aspect for the proper mechanical working of the Winch.
In case of doubt concerning the assembly procedure contact Harken
®
Tech Service at
techservice@harken.it