10
Performa
™
Winch
50.2 STP EL/HY
Installation and Maintenance Manual - Mod.D
NOTICE
Before positioning the flange, check to make sure
that seal is seated correctly.
After winch is assembled and before sailing, test the powered winch functioning: insert the lock-in
winch handle in the handle socket and check that the disconnect rod must disconnect gearbox.
Electric equipment
To guarantee greater efficiency in terms of safety and long life, for every winch model is mandatory
to install the Dual Function Control Box.
To fasten the Dual Function Control Box containing solenoids to bulkhead or wall, for all
installation details and for all electric wiring schemes, refer to the Dual Function Control Box
manual.
WARNING!
Before installing and using the device, read carefully the Dual Function Control Box manual
available on web site www.harken.com
Refer to the following chart for wire size:
Total distance between winch and battery
Winch
size
Current
voltage
Under 16.4 ft
AWG
Under 5 m
mm
2
16.4 - 32.8 ft
AWG
5 m - 10 m
mm
2
32.8 - 49.2 ft
AWG
10 m - 15 m
mm
2
49.2 - 65.6 ft
AGW
15m - 20 m
mm
2
50.2
12 V
2
32
0
50
00
70
000
95
50.2
24 V
5
16
3
25
2
35
0
50
Refer to the following chart for HCP model:
Winch
size
Current
voltage
HCP model
Ampere
rating
50.2
12 V
HCP1720
135A
50.2
24 V
HCP1717
80A