15
Installation
Connecting the ground from the wing to the
stove body
•
The green wire with a female terminal is the stove
body ground.
•
On the combustion air inlet box there is a male ter-
minal ground.
•
If service is performed on this stove, this ground
connection must be the first one on and the last
one off.
Fig.31
Fig. 32
Fig. 33
15.
Install the cast side panels by sliding them down
over the lasered hinge pin. Note: Check for rotational
swing, but finish with them in the open position. The cast
side panels may need adjustment after the stove body
is latched into place and the front door is closed.
Connecting the power cord
The white from the mounting frame connects to the
white of the insert body. The black from the mounting
frame connects to the brown of the insert body.
2 x 4
Lasered hinge pin pivoting point
Up and down clearance adjustment slots.
Cast side
panel hinge
Fig. 30
16.
Place the stove body on the mounting shell gasketed
rails and insert the body into the opening far enough that
it can't tip out. Note: A service rail kit (Part #1-00-08007),
or a pair of 2 x 4's supported in front of the hearth will
make this job easier. See Fig. 31.
17.
Complete the following electrical connections
(CAUTION: Disconnect the power cord.) There are 5
connections that must be completed. See Fig. 33 & 34.
Summary of Contents for Harman Accentra Insert
Page 36: ......
Page 37: ......
Page 44: ...44 Service Maintenance Log Date Of Service Performed By Description Of Service...
Page 47: ......