25
DECK MECHANISM DISASSEMBLY
PCB ASSEMBLY JUNCTION
(L3)
(C7)
(S7)
(S7)
(S7)
(S8)
GEAR ASSEMBLY RACK
RUBBER DAMPER
PICK UP
ASSEMBLY
GENERAL
GEAR MIDDLE
BASE PU(OUTSERT)
RUBBER DAMPER
RUBBER REAR
RUBBER REAR
GEAR ASSEMBLY FEED
GEAR MIDDLE
GAER ASSEMBLY RACK
PICK UP ASSEMBLY GENERAL
MOTOR ASSEMBLY SPINDLE
GEAR ASSEMBLY FEED
(S7)
(A)
(S6)
(S5)
(C5)
(C6)
(S6)
(B)
PCB ASSEMBLY JUNCTION
FRAME UP/DOWN
BASE MAIN
FRAME UP/DOWN
GEAR UP/DOWN
3. Frame Assembly Up/Down(Fig. 4-3)
1) Release Screw(S5).
3-1. PCB Assembly Junction
1)Unconnect the 5 Connectors(C5), (C6).
2)Release 2 Screws(S6).
3-2. Base Assembly Sled Damper
• Put the Base Assembly Main on original position(Top side)
1) Release 4 Screws(S7).
2) Disconnect the Connector(C7).
3-2-1. Gear Assembly Feed
1) Look the Locking Tab(L3) in direction of arrow.
3-2-2. Gear Assembly Middle
3-2-3. Gear Assembly Rack
1) Release the Screw(S8).
3-3. Rubber Damper
3-4. Frame Up/Down
Fig. 4-3
Note