20
Installation
Draft Test Procedure
After the venting is completed, the firebox low draft
will need to be checked and possibly adjusted. After re-
moving the 3/8” bolt from the draft hole shown in Fig. 9,
insert the draft meter tube. The hopper lid must be latched
during this test. (It is recommended that the draft meter
have a scale of 0 to 1” WC.)
Turn the feed adjuster to “Test”. this will start the com-
bustion blower and allow you to check and record the High
Draft ______ - IWC date _______ (There is no adjust-
ment for the High Draft)
After the first 60 seconds the “Test” mode lowers the
combustion blower voltage to the Low Burn voltage. (The
“Test” mode cycles the voltage from high to low every 60
seconds).During this lowered voltage cycle the Low Burn
Draft must be checked and adjusted if necessary. The
recommended low draft setting should be between -.25 &
-.35 IWC. Depending on the amount of vertical rise, it may
not be possible to get a low draft reading in this range. In
this case, a maximum low draft of -.55 is acceptable.
The adjustment screw is through the small hole to the
right of the Igniter Light. See Fig. 10
.
Adjusted Low Draft
is __________ -IWC.
Don’t forget to turn the feed adjuster back to #4.
Draft Bolt Location
Viewing Window
Air wash Slot
Fig. 9
“Test”
Low Draft
Adjustment Pot
Fig. 10
The Control
The PB105 has the option to have the control panel
covered or un-covered See Fig. 11. There is a pair of slots
provided for each position. Simply move the cover to the
desired position by placing the tabs on the cover in the
proper slots.
WARNING: Do not operate with fire
chamber or ash removal doors open.
WARNING: Do not store fuel or other
combustible material within installation
clearance area.
CAUTION: Hot while in operation. Do not
touch. Keep children, clothing, furniture, and
other combustible material out of the
installation clearance area.
Fig. 11
Covered
Un-Covered
Air Wash Slot
Summary of Contents for PB 105
Page 2: ......
Page 10: ...10 Venting Fig 3 ...
Page 15: ...15 Installing Duct Installation ...
Page 17: ...17 Installation ...
Page 18: ...18 Installation ...
Page 19: ...19 Installation ...
Page 33: ...33 Feeder Parts ...
Page 35: ...35 Wiring Diagram Wiring Diagram ...
Page 38: ...Testing Label 38 ...
Page 39: ...NOTES 39 ...